80 likes | 193 Views
Status of the DELTA Control System. Elke Kasel June 2003. Accelerator Complex. Energy 1.5 GeV Circumference 115.2 m Beam Current 150 mA Lifetime 6 h @100 mA Insertion Devices 3 Number of Beamlines 12 (not all equipped)
E N D
Status of the DELTA Control System Elke Kasel June 2003
Accelerator Complex Energy 1.5 GeV Circumference 115.2 m Beam Current 150 mA Lifetime 6 h @100 mA Insertion Devices 3 Number of Beamlines 12 (not all equipped) Start of User-Operation 3/1999
The Control System • Version of EPICS: Release 3.13.6 • Number of VME-IOCs: 25 (most PPC) • 4 Testbed VME-IOCs • 2 Beamline VME-IOCs • 7 Linux-PCs • 3 Windows PCs • 1 HP-Workstation • Number of EPICS records: 8490
Controls Design Fields of our own work „official“ EPICS extensions are not used (currently)
Beamline Control • 2 Beamlines in use: • BL5 [Undulator] (FZ Jülich) Labview on Mac • BL9 [Wiggler] (Univ Dortmund) Spectra (from Hasylab) on Linux • 2 Beamlines under construction: • BL11 [Undulator] (Univ Dortmund) EPICS on Linux PC and VME (build by COSYLab) • BL12 - TGM3 [Dipol] (Univ Dortmund) EPICS on VME • 2 Beamlines currently being designed
Human Resources • 1 permanent „Group“-Leader • 1 permanent Technician (Hardware Installation, Network) • 3 PhD Students • 3 PhD Students (two gone and one going to leave at the end of this year) (two gone and one going to leave at the end of this year) Control GROUP?
Future Plans • consolidate status quo (accelerator control) • integration of beamlines (provide machine information via EPICS for beamlines) • migrate controls of insertion devices to EPICS • U250-Undulator: old DELTA system • U55-Undulator: Labview on Windows • SAW-Wiggler: Labview on Windows