1 / 18

Enterprise Remote Monitoring CBM AG

2 Sept 2009. 2. AGENDA. ICAS (Ashore

aya
Download Presentation

Enterprise Remote Monitoring CBM AG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Enterprise Remote Monitoring CBM+ AG 2 Sept 2009

    2. 2 Sept 2009 2 AGENDA ICAS (Ashore & Afloat) Remote Monitoring IPARs & ePARs Commonality & Savings Where were headed CBM/RM challenge

    3. 2 Sept 2009 3 ICAS Capabilities - Afloat

    4. 2 Sept 2009 4

    5. 2 Sept 2009 5

    6. 2 Sept 2009 6

    7. 2 Sept 2009 7

    8. 2 Sept 2009 8 Reverse Distance Support Timeline

    9. 2 Sept 2009 9 IPAR Expansion / Evolution

    10. 2 Sept 2009 10 From Enterprise Level to Data in 3 Clicks

    11. 2 Sept 2009 11

    12. 2 Sept 2009 12 IPAR / Remote Monitoring Metrics IPAR Summary Dec 06 Nov 07 12 System IPARs complete MPDE, GTM, GTG, AC, HPAC, LPAC, EVAP, RO, Refer, etc 3321 Ship data submittals High Month: Oct 07: 383 72 Separate Ships 92% ICAS Surf Ships High Month: Oct 07: 46 707 IPARs were released High Month: Aug 07 : 101 Business Rules Currently optimizing process via SWE Process Metrics presented to SWE BOD

    13. 2 Sept 2009 13

    14. 2 Sept 2009 14

    15. 2 Sept 2009 15 COMMONALITY The Integrated Condition Assessment System (ICAS) is the poster child for Fleet Commonality Surface Combatants (60/100) Amphib & Minesweeps (24/34) Carriers (6/11) The same ICAS software is utilized on all installations Enterprise class based system training Shared logistics costs Shared system support costs Shared implementation costs

    16. 2 Sept 2009 16 A Cross Platform, Common Solution

    17. 2 Sept 2009 17 Where Were Are Headed LCS Developing Equipment Health Monitoring System to be installed Post Phase 1 - Data Qualification Engine developed for Main Engines and Generators Additional auxiliary systems under development TYCOM, OPNAV N43, LCSRON view CBM as critical for LCS success DDG 1000 Developing Enterprise Remote Monitoring (eRM) in support of PMS 500 Collaborating with NSWCPH for Combat Systems CVN Installed on CVN 70, 72, 73, 74, & 75 Working with PEO Carriers and AIRFOR on full Remote Monitoring implementation

    18. 2 Sept 2009 18

    19. 2 Sept 2009 19 Navys CBM/RM Challenge

More Related