1 / 1

Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053)

Surface Penetration Hazards Mitigation. Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053) For depth greater than 1 ½ inches Not just ground Floors, slabs, walls, ceilings, beams, fixed structures, etc. Not just digging

baris
Download Presentation

Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Surface Penetration Hazards Mitigation • Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053) • For depth greater than 1 ½ inches • Not just ground • Floors, slabs, walls, ceilings,beams, fixed structures, etc. • Not just digging • Drilling, probing, nailing, ANYTHING THAT PENETRATES an existing surface • Call Before You Dig, Drill, Probe, Nail……..

More Related