130 likes | 248 Views
Learn lessons from the Emilia-Romagna Pilot Project regarding the implementation of ICZM guidelines at the provincial scale, focusing on the Ferrara Coast. Understand the steps involved in the pilot project, interaction between spatial planning and ICZM topics, and the cognitive frame draft. Explore phases in the planning process, assessment procedures, environmental assessment, and adoption of the plan.
E N D
Lessons learned from theEmilia-Romagna Pilot Project (WP4): PROPOSAL OF SPATIAL PLAN ACCORDING TO ICZM PRINCIPLES Final Meeting Meeting Ravenna 27 March 2008 Maria Romani
Basic Facts about the pilot project • Implementation of Regional ICZM Guidelines at provincial scale • Ferrara Coast • DG Environmental • and DG Spatial Planning • first application 2006-2008 • implementation Provincial • and Municipal Plans: • Plan objectives and alternatives • defining indicator and monitoring system • to assess Plan effects
Pilot project steps • The analysisof the state in different sectors aimed at identifying and defining specific problems and criticality relating to different thematic profiles • The drawing up of a document (Stocktake) describing the state of environmental, territorial and infrastructure resources by “sensitive/significant topics” to the territorial planning • An integrated assessment of the different levels of criticality • Adoption of the plan’s objectives • Evaluation of criticality in relation to these objectives in order to identify preliminary criteria, directions and conditions related to the feasibility of the plan’s possible actions
IMPLEMENTATION REGIONAL ICZM GUIDELINES pilot project activites Interaction between spatial planning and ICZM topics COGNITIVE FRAME DRAFT How can be implemented Regional ICZM Guidelines PTCP (Provincial Territorial Plan) First measure to reduce negative environmental effects implementation: the Plans same measure to reduce environmental problems linked with coastal system PSC (Municipal Structural Plan)
Phases Planning process Assessment process Preliminary assessment Screening Konw how ---- Public consulting Environmental assestment Preliminary document of the plan Evaluation of preliminary strategy Generalobjectives Scoping Preliminary documents of the plan Planning conference Externalcoherence Specificobjectives Internalcoherence Performanceassessment Identify planning strategies Assessment of alternative options PlanningPolicies Consulting procedures and adoption/ approbation Environmentalreportvsmonitoring Plan’sproject Planningconference Analysisofpublicobjection Adoption / Approbation ofthePlan Plan’sadministration Planning Performance Monitoringandreview Correctiveaction Planning and assessment process
Interaction between spatial planning and ICZM topics Topic 2: Pollution, water resource management and monitoring Topic 3: Ports, ship wastage and sea transport risk Topic 1: Physical coastal system, risk factors and defence strategies Urban Settlement system Topic 4: Habitat, biodiversity and landscape Topic 5: Tourism Mobility system Infrastructure system Topic 9 Topic 6: Fishing and aquiculture Topic 7: Agriculture Topic 8: Energy policies
Environmental vulnerability: High for Salt water intrusion into aquifers; medium/high for sea ingression
Interaction matrix Context 1:Town centre
Interaction matrix Context 1:Town centre
Interaction matrix Context 1:Town centre
Discussion points Comparing the PlanCoast Handbook messages vs spatial planning • Public Institutions improve an integrated Knowledge system to assess and monitore coastal system and plan‘s effects • IMSP have to be developed not only when needed but always like an ordinary activity of Public Institutions