Barton Village BO 1449(33) Bridge 58 on TH 4 over Barton River

Learn about deficiencies in the existing bridges, new design plans, construction expectations, and ask questions. Full details on terms used, traffic data, accelerated bridge construction, closure dates, detour routes, and project summary provided.

berthal
Download Presentation

Barton Village BO 1449(33) Bridge 58 on TH 4 over Barton River

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Barton Village BO 1449(33) Bridge 58 on TH 4 over Barton River Barton Village BHF 0286(5) Bridge 20 on VT Route 16 (TH 2) Over Crystal Lake Outlet Douglas E. Bonneau, P.E. Vtrans Project Manager Joshua K. Olund, P.E. PHD T.Y. Lin International May 18, 2017

  2. Project Locations

  3. Purpose of Meeting • Describe deficiencies of existing bridges • Explain new bridge designs • Construction expectations • Provide you with a chance to ask questions

  4. Description of Terms Used Beams (Superstructure) Bridge Rail Deck Abutment (Substructure)

  5. Project Background Traffic Data Bridge 20 Traffic Data Bridge 58

  6. EXISTING BRIDGE DEFICIENCIES Deficiencies • The granite slabs of bridge 20 are in fair condition and have an unknown capacity • The deck and superstructure of bridge 58 are in poor condition • The bridges do not have adequate hydraulic capacity • The bridge rail is substandard on both bridges Inspection Report Information (Based on a scale of 9) Deck Rating 5 Fair (Br 20) 4 Poor (Br 58) Superstructure Rating 5 Fair (Br 20) 4 Poor (Br 58) Substructure Rating 5 Fair (Br 20) 5 Fair (Br 58)

  7. Bridge 20 Looking South

  8. Bridge 20 Looking North

  9. Bridge 20 Downstream Fascia

  10. Bridge 58 Upstream Fascia

  11. Bridge 58 Looking Toward VT 16

  12. Bridge Typicals Bridge 58 Roaring Brook Road Bridge 20 VT 16

  13. Bridge 58 Layout

  14. Bridge 20 Layout

  15. Accelerated Bridge Construction With Bridge Closure • Allow 24/7 construction during bridge closure • Contract incentives/dis-incentives to encourage contractor • Roaring Brook Road Closure Dates: June 12th – 26th • VT16/Glover Road Closure Dates: July 5th – Aug. 2nd • Public Outreach to provide advance notice for planning • Local share is cut in half (10% reduced to 5%) by allowing short term road closures

  16. Detour Route A-B Thru Route = 0.4 miles A-B Detour Route = 0.8 miles Added Miles = 0.4 miles End-End = 1.2 miles

  17. Accelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately 30 projects. • The following slides show an example of a past project with construction that will be similar to bridge 20 on VT16.

  18. Accelerated Bridge Construction Driven steel piles with precast concrete cap for abutment

  19. Accelerated Bridge Construction The first of three Precast Concrete Caps being placed

  20. Accelerated Bridge Construction Precast concrete Abutment in place and ready for Superstructure

  21. Conclusion and Summary • Full Bridge Replacement using ABC & short-term closure • Long term (80 year) fix • Two bridges combined and coordinated into one project • Improved hydraulic performance at both bridges • Minimal mobility impacts • Provides for reduced local share given road closure • Local contractor & labor used for project • Project bid price: $2,122,462 (both bridges combined) • Local Share is 5% of all costs

  22. Questions