250 likes | 358 Views
MSD 1 Week 6 System design Review. Team 15462 Rochester Institute of Technology College of Engineering. Agenda. System Analysis Function Decomposition Brainstorm Selection Criteria Pugh Chart Final System Selection Concept Feasibility Test Plan Updated Project Plan
E N D
MSD 1 Week 6 System design Review Team 15462 Rochester Institute of Technology College of Engineering P15462
Agenda System Analysis • Function Decomposition • Brainstorm • Selection Criteria • Pugh Chart • Final System Selection • Concept Feasibility • Test Plan • Updated Project Plan • System Architecture • Risk Assessment Background • Underlying Mission • Problem Statement & Deliverables • Customer Needs & Engineering Requirements • Week 3 action item review P15462
Underlying Mission To Harvest Energy from High Altitude Winds P15462 250m 100m 100m 250m
Problem Statement & Deliverables The goal of this project is to design, build, and reliably test a powered, human-controlled tethered glider specifically for use as an airborne wind energy system (or AWT) • Tethered glider capable of continuous circular flight • Integration with current base station • 30 flights, each 3 minutes or longer, with tether tension and glider position recorded • Functional simulation of flight path P15462
Customer Needs P15462
Engineering Requirements The Cooper–Harper Rating scale is a set of criteria used by test pilots and flight test engineers to evaluate the handling qualities of aircraft during flight test. P15462
House of quality P15462
Glider Purchase P15462
Aero Club Flight video P15462
Agenda System Analysis • Function Decomposition • Brainstorm • Selection Criteria • Pugh Chart • Final System Selection • Concept Feasibility • Test Plan • Updated Project Plan • System Architecture • Risk Assessment Background • Underlying Mission • Problem Statement & Deliverables • Customer Needs & Engineering Requirements • Week 3 action item review P15462
Functional Decomposition P15462
Agenda System Analysis • Function Decomposition • Brainstorm • Selection Criteria • Pugh Chart • Final System Selection • Concept Feasibility • Test Plan • Updated Project Plan • System Architecture • Risk Assessment Background • Underlying Mission • Problem Statement & Deliverables • Customer Needs & Engineering Requirements • Week 3 action item review P15462
Benchmarking P15462
Brainstorm P15462
Selection Criteria P15462
Pugh Chart P15462
Agenda System Analysis • Function Decomposition • Brainstorm • Selection Criteria • Pugh Chart • Final System Selection • Concept Feasibility • Test Plan • Updated Project Plan • System Architecture • Risk Assessment Background • Underlying Mission • Problem Statement & Deliverables • Customer Needs & Engineering Requirements • Week 3 action item review P15462
Final System Selection P15462
Concept Feasibility P15462
Agenda System Analysis • Function Decomposition • Brainstorm • Selection Criteria • Pugh Chart • Final System Selection • Concept Feasibility • Test Plan • Updated Project Plan • System Architecture • Risk Assessment Background • Underlying Mission • Problem Statement & Deliverables • Customer Needs & Engineering Requirements • Week 3 action item review P15462
Updated Project Plan P15462
System Architecture P15462
Risk Assessment P15462
Sources P15462