An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. End Project Begin Project Welcome to theSR 530/US 192 Highway Improvement Project Informational MeetingThursday, February 8, 2007

  2. Technical Coordinating Team • Florida Department of Transportation • Mr. Joel Marmie, P.E. – Project Manager

  3. Authority • The Financial Project Number for the project is: 239304-1-52-01 • This public meeting is being held in accordance with Chapter 120, Florida Statutes.

  4. Authority (Continued) This project is being developed in accordance with the Civil Rights Acts of 1964 and 1968. Under Title VI and Title VIII of the Civil Rights Acts, any person(s) or beneficiary who believes they have been subjected to discrimination because of race, color, religion, sex, age, national origin, disability, or familial status may file a written complaint with the FDOT's Equal Opportunity Office, 605 Suwannee Street, MS 65, Tallahassee, Florida 32399-0450. (850)-414-4747.

  5. PROJECT DESCRIPTION • Completes the missing segment of the four lane to six-lane widening project between the Orange/Lake County line and Secret lake Drive.

  6. PROJECT DESCRIPTION • Two ponds within the limits of the project will be enhanced and upgraded.

  7. PROJECT DESCRIPTION • Two ponds within the limits of the project will be enhanced and upgraded.

  8. Project-SpecificRecommendations: • Swales on the outside right-of-way

  9. Project-SpecificRecommendations: • Curbs and gutters in the median

  10. Project-SpecificRecommendations: • Sidewalks will be constructed on both sides of the highway.

  11. Project-SpecificRecommendations: • A new traffic signal at Secret Lake Drive

  12. Project-SpecificRecommendations: • A new traffic signal at Secret Lake Drive

  13. Median Opening Modifications Camping Connections RV Store • From Full Median Opening to EB/WB Directional Opening

  14. Median Opening Modifications West Driveway of Westside Development • WB Directional to EB/WB Directional

  15. Median Opening Modifications Osceola County Firestation • Full Opening to WB Directional, with full access for emergency vehicles; No EB U-Turns

  16. Median Opening Modifications Howard Johnson Maingate Resort • Close full access

  17. Median Opening Modifications Pizza Hut/Lighthouse Key • Close full access

  18. SR 530/US 192Highway Improvement Project FIN: 239304-1-52-01 Florida Dept. of TransportationFOR ADDITIONAL INFORMATION ABOUT FDOT PROJECTS AND PROGRAMShttp://www.dot.state.fl.us