1 / 11

Boulder Flycasters & CTU South Boulder Creek Project

Boulder Flycasters & CTU South Boulder Creek Project. Presented to the City of Boulder Water Resources Advisory Board Monday, August 21, 2006. Project presentation South Boulder Creek virtual tour Supporting studies and documents.

bruno
Download Presentation

Boulder Flycasters & CTU South Boulder Creek Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Boulder Flycasters & CTU South Boulder Creek Project Presented to the City of Boulder Water Resources Advisory Board Monday, August 21, 2006 • Project presentation • South Boulder Creek virtual tour • Supporting studies and documents

  2. Boulder Flycasters & CTU Long Standing Support of South Boulder Creek • 1990-95: Completed habitat improvements along the SBC trail in conjunction with Trout Unlimited, the City of Boulder and DOW. • 1997-99: Boulder Flycasters & CTU attended the public hearing on Gross re-licensing and lobbied for environmental considerations • Negotiated $250k in SBC habitat improvements above Gross Reservoir • Recently renegotiated to allocate $125k below Gross • 2003: Organized the SBC Committee to investigate options for increasing minimum winter flows • Contracted Hydrosphere Inc. to update a 1996 report recommending in-stream exchange and structural improvement opportunities • 2004: Conducted the SBC Watershed Symposium

  3. 2004 SBC Symposium • Goals • Review opportunities for cooperative agreements between SBC water stakeholders to achieve and maintain a minimum stream flows of 7cfs or greater throughout the year. • Participants • Guest Key Note Speaker, David Getches, Dean, University of Colorado School of Law • Symposium Facilitator, Larry Mac Donnell, Attorney, Porzak, Browning & Bushong • Denver Water Department • Marc Waage, Manager of Raw Water Supply • Don Kennedy, Water Resource Planner • Travis Bray, Water Resource Planner • Boulder Utilities, Carol Ellinghouse, Director of Public Works • Curry Rosato, Water Specialist • City of Lafayette, Doug Short, Public Works Director • Bruce Kroeker, Water Rights Consulting Engineer • Bradley Dallam, Civil Engineer III • Dan Mathes, Water Resource Engineer • City of Louisville, Thomas Phare, Director of Public Works • District 6 Water Commissioner, Robert Carlson • Boyd Sheets, staff member • Boulder Mountain Parks & Open Space • Bob Crifasi, Water Resource Specialist • Don Domico, Wetland and Riparian Ecologist • Xcel Energy, Randy Rhodes, Water Coordinator & Resource Planning Manager • Boulder County, Pete Conovitz, Water Resource Specialist • Trout Unlimited • Boulder Flycasters President Lloyd Brady and numerous BFC board members. • Colorado Trout Unlimited Executive Director David Nickum staff members • Colorado Trout Unlimited President Sharon Lance

  4. 2004 SBC Symposium • ConclusionsSeveral Hydrosphere recommendations had merit for implementation or further study. • Lafayette closure of Marshall WTP/Lafayette Pipeline and delaying diversion of winter borrowing program water to Baseline Reservoir • Release water from Barker to SBC for ISF purposes • Would require a new pipeline from Kossler to SBC via Wood Gulch • Recapture released water in Wittemeyer Ponds • Would require lining of the ponds for additional storage capability • Exchange from Wittemeyer to Barker • Xcel to allow for seasonal storage of Valmont supplies in Gross, with fall/winter delivery • Boulder Open Space to acquire appropriate SBC water rights for ISF purposes (could be a joint acquisition with Lafayette) • Lafayette pipeline @ 75thSt. pump-over highlighted concerns over water quality and transmission losses. • Denver Water was not receptive to discussions concerning permanent allocation of the Boulder environmental pool in Gross Reservoir

  5. 2004 SBC Symposium • Results • 1st step in bringing together all key SBC stakeholders to discuss common interests in SBC watershed management • Winter 2005 conducted a walk-a-bout inspection of SBC diversions for leakage with Boulder & Lafayette • Lafayette has changed its winter borrowing diversion from the MWTP pipe line to in stream transmission. (10/15 to 4/1) A gain of 2-3 cfs from Community Ditch to Baseline • Multiple discussions with Boulder Utilities & Xcel Energy trying to find Valmont winter exchange capability • Developed a test plan to add CBT water to the Gross Environmental Pool in the fall of 2006 for winter flow study • No exchange potential so far this season to complete this effort • Continued work to modify diversion structures for fish passage. • Completed Shearer in 2000, South Boulder Canyon in 2006, McGinn planned for 2007, Good-Hue next on the radar

  6. Our efforts to date have not been enough Pictures taken on SBC in the fall of 2005 between South Boulder Rd. & Baseline Rd.

  7. Symposium Requests for Action • Boulder Utilities • Boulder Mountain Parks & Open Space • Xcel Energy • City of Lafayette • Denver Water

  8. Boulder Utilities • Release water from Barker to SBC for ISF purposes (would require a new pipeline from Kossler to SBC) • We request the WRAB to recommend that city staff study this option and propose an implementation plan. • Recapture released water in Wittemeyer Ponds (would require lining) • We request the WRAB recommend city staff study the lining of Wittemeyer ponds. • Exchange from Wittemeyer to Barker • Allow Lafayette to exchange from Goose Haven to 75th Street against ISF releases

  9. Boulder Open Space • Acquire appropriate SBC water rights for ISF purposes (could be a joint acquisition with Lafayette) • We request WRAB help increase council and city staff awareness of the importance of water acquisition for ISF • Work with Lafayette to eliminate fall/winter season losses at ditch headgates • SBC stream channel improvements

  10. Summary of Requests Water Resources Advisory Board • We request WRAB’s support for the proposed SBC project • Further request the board to take the following actions: • Recommend Boulder Utilities staff evaluate the Wood Gulch/Kossler option diverting Barker Reservoir water to SBC for wintertime flow enhancement • As part of this evaluation, we recommend staff investigate the lining of Wittemeyer ponds. • Creating the ability to recapture water released for in stream flow enhancement, and uses of water stored in these ponds including exchanges • That WRAB help to increase council and city staff awareness of the importance of water acquisition for ISF

  11. Boulder Flycasters & Colorado TU Commitments • Continued public support of Boulder watershed in stream flows through collaborative work with other watershed stakeholders. • CTU support of initiatives requiring CWCB and water court approvals • Participation in fund raising and grant proposals to fund SBC minimum flow initiatives

More Related