1 / 6

GVC Group Update Andy Pace

6 October 2011. GVC Group Update Andy Pace. 1 | Energy Networks Association - DCMF . GVC workshops. 6 October 2011. 2 | Energy Networks Association – DCMF. The series of five industry-wide workshops is now complete, covering:

carney
Download Presentation

GVC Group Update Andy Pace

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 6 October 2011 GVC Group Update Andy Pace 1 | Energy Networks Association - DCMF

  2. GVC workshops 6 October 2011 2 | Energy Networks Association – DCMF The series of five industry-wide workshops is now complete, covering: • A general overview of the losses incentive and the two “top down” methodologies proposed for data correction. • The data available to DNOs that might provide a basis for other correction methodologies • Possible amendments to the BSC to improve losses reporting. Outcomes: • No additional data sources have emerged. • No new methodologies for data correction have emerged to date. • Potential modifications to BSC have been identified to improve future reporting.

  3. Potential BSC Modifications 6 October 2011 3 | Energy Networks Association – DCMF 14 options discussed at workshops of which two have progressed to formal modification proposals: • Abandoning the principle of gross volume in settlements and stopping compensatory adjustments (P274). • Extending BSC Performance Assurance (P275) In the context of the Losses Incentive: • None of the options discussed could address historic issues or a general increase in supplier data cleansing after target setting. • There is an underlying concern that the losses incentive is unable to deliver on its objectives of encouraging DNOs to achieve an efficient level of losses on their distribution networks. • The GVC Group have written collectively to Ofgem, expressing these concerns.

  4. BSC Proposal P274 6 October 2011 4 | Energy Networks Association – DCMF P274 ‘Cessation of Compensatory Adjustments’ • P274 proposes to amend the BSC so that ‘crystallised’ errors cannot be compensated for in subsequent Settlement calculations. A direct consequence of this would be to remove the process of Gross Volume Correction (GVC). GVC is a technique which Suppliers can currently use to correct ‘crystallised’ errors (i.e. errors for Settlement Days which have been through a Final Reconciliation (RF) Run) by altering volumes for other Settlement Days which have not been through RF. • P274 will impact Suppliers and Non Half Hourly Data Collectors, and is intended to benefit Suppliers and Distributors.

  5. BSC Proposal P275 6 October 2011 5 | Energy Networks Association – DCMF P275 ‘Extending BSC Performance Assurance’ • P275 proposes to broaden the responsibilities and scope of Performance Assurance under the BSC to include all BSC Parties, rather than just Trading Parties.  It also proposes that Performance Assurance should consider the risks that Settlement data issues may present to BSC Parties that make use of this data for purposes other than the determination and settlement of Trading Charges. • P275 will impact all BSC Parties, particularly those who are not Trading Parties (e.g. Distributors, Interconnector Administrators and the Transmission Company). • The BSC Panel will consider the Initial Written Assessments at its meeting on 13 October 2011, when it will agree how to progress P274 and P275.

  6. Next Steps 6 October 2011 6 | Energy Networks Association – DCMF

More Related