1 / 7

Optimization: Technical Performance Allocation

EMIS 8340. Systems Engineering Tool—applying tools to engineering systems. Optimization: Technical Performance Allocation. Mark E. Sampson. Requirement Types… Allocatable (Weight, Cost,…) Non-Allocatable (material/process standards that apply to everything) …shall be painted green

cassia
Download Presentation

Optimization: Technical Performance Allocation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMIS 8340 Systems Engineering Tool—applying tools to engineering systems Optimization: Technical Performance Allocation Mark E. Sampson

  2. Requirement Types… • Allocatable (Weight, Cost,…) • Non-Allocatable (material/process standards that apply to everything) • …shall be painted green • …shall be written in Mil-Std 1750 compliant ADA • …let’s talk about the interesting ones… [DSMC 1986 6.4]

  3. Requirements Allocation…the big picture • Captured requirements… • Linking requirement to functions… • Functions linked to physical alternatives/architectures… • …keep going until realizable • …requirements flow thrusystem & documentedin allocation matrix R R R R R Motor Battery Drive Processor Allocation Matrix R Func1 Battery R Battery R Func2 Motor [SE Handbook 9.2 ] [DSMC 1986 6.4]

  4. Technical Budgets/Targets/Design Constraints • Come from external interfaces, drivers, constraints… • “How much” coming from functions • Allocated/divided up among design alternatives • Quantifiable requirements like: • weight • power • thru-put • cost • error • … • Example allocation flow-down: • System-transmit collected data in real time to remote ground site • Segment-provide wideband data link from spacecraft to relay • Element-provide 10Mhz link at 17Ghz • Sub-system-provide 10Mhz link at 17Ghz with 10W effective radiated power for 20 minutes per orbit revolution [SE Handbook 9.2.2] [Lacy 1992]

  5. Flowing-down Technical Budgets/Constraints… • Tools are an important part of this process... • Math Models • Excel • Tracing tools with extensions… • A few SE tools include integrated budgeting (SLATE, Cradle-SEE,…) • SLATE Technical Budgeting Demo… [SE Handbook 9.2.2] [DSMC 1986 6.4.4]

  6. Costing…Design to Cost, Life Cycle Costing,… • Predicting the cost of your system • Using it as critical parameter for choosing alternatives • Apparently we aren’t very good at predicting how much something will cost…particularly in software: • GAO: “only 2% of software is usable exactly as delivered” • Standish: “53% of projects will cost 189% of estimates” • …either we are poor at executing or we are poor at estimating • Engineered Costing relies on bottom-up rollups of tasks, etc. • Analogs—just like this other one • Rules-of-thumb—test costs 25% of manufacturing • Validated/Modeled rules-of-thumb—Parametric Cost Estimation Models [www.jfc.nasa.gov/bu2/] [DSMC 1986 17]

  7. Costing…Parametric Cost Estimation • Identifies Cost Estimating Relationships (CERs) & “logic” among those relationships to estimate costs. • Cost Estimates are then validated/tested using statistical techniques • A number of hardware/software cost models have been created: • Price-H,-S,… (LMCO) • REVIC • COCOMO • AMCM--missions • SoftCost-R • …and a systems model is under development… • COSYSMO Dr. Barry Boehm (USC) Dr. Richardo Valerdi (MIT/UofA) Present/Demo Unmanned Mission Non-recurring Cost Model [www.jfc.nasa.gov/bu2/]

More Related