1 / 11

Presented to Union County Board of Commissioners Presented by CH2M HILL Bob Forbes, PE

Update of Wastewater Treatment Capacity Alternatives Evaluation for the Yadkin - Pee Dee Basin of Union County, NC. Presented to Union County Board of Commissioners Presented by CH2M HILL Bob Forbes, PE March 1, 2007. Agenda. Project background Alternatives evaluation overview

Download Presentation

Presented to Union County Board of Commissioners Presented by CH2M HILL Bob Forbes, PE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update ofWastewater Treatment Capacity Alternatives Evaluationfor the Yadkin - Pee Dee Basin of Union County, NC Presented to Union County Board of Commissioners Presented by CH2M HILL Bob Forbes, PE March 1, 2007

  2. Agenda • Project background • Alternatives evaluation overview • Non-economic parameters • Economic parameters • Summary • Questions

  3. WWTF Alt. 3A

  4. Basis for evaluation of alternatives • Non-economic factors • NPDES permit factors • Institutional issues • Long-term suitability of WRF site • Other environmental factors • Capital costs • Site issues

  5. WWTF Alt. 3A Alt. 3A Route

  6. Non-economic comparison

  7. Non-economic comparison (cont.) Rank

  8. Cost Comparison – First 8 Alternatives

  9. Cost Comparison – Other 4 Alternatives TABLE 3 Summary of Potential Costs in Million Dollars (last four alternatives evaluated, with capacity increased from 5 MGD to 6 MGD in initial phase, decreased from 10 MGD to 9 MGD in 2nd phase, and updated from March 2004 to November 2006 dollars)

  10. Evaluation Summary Non-economic rankings are from Table 1; cost rankings are in order of estimated costs (lowest to highest, from Tables 2 & 3), and the overall rankings of the 12 alternatives represent the sum of non-economic and cost rankings

More Related