1 / 9

EMERGENCY EVACUATION

EMERGENCY EVACUATION. EMERGENCY EVACUATION DEMONSTRATIONS. Full-scale done by manufacturer Partial Evacuation Demonstration required for issuance of AOC Full complement of crew members 50% of slides deployed No passengers. PROCEDURES FOR PARTIAL EVACUATION DEMONSTRATION.

cayla
Download Presentation

EMERGENCY EVACUATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMERGENCY EVACUATION

  2. EMERGENCY EVACUATION DEMONSTRATIONS • Full-scale done by manufacturer • Partial Evacuation Demonstration required for issuance of AOC • Full complement of crew members • 50% of slides deployed • No passengers

  3. PROCEDURES FOR PARTIAL EVACUATION DEMONSTRATION • Planning meeting to discuss exact procedures and criteria • Require aircraft, flight crew and two complete cabin crew • Conducted in darkness • Aircraft electrical system powered • Simulate preparation for takeoff • Cabin attendants seated • Simulate take-off roll then electrical failure • Simulated fire to 50% of exits • 15 secs to fully deploy the slides

  4. EVALUATION OF EVACUATION DEMONSTRATION • Adherence by flight and cabin crew to assigned duty • Effectiveness of PIC in exercise of command • Succession of command in event of casualties • Effectiveness of crew for evacuation duties • Shortcomings, deficiencies or delays

  5. DITCHING DEMONSTRATION

  6. DITCHING • Demonstration required for Type Certification • Full scale demonstration by manufacturer • If aircraft not certified for ditching, extended overwater flights should not be authorized

  7. PARTIAL DITCHING EVALUATION AREAS • Emergency training programme • Ditching procedures • Crewmember competency • Equipment adequacy and reliability

  8. PROCEDURES FOR DEMONSTRATION • Conducted during daylight • All required crewmembers used • Passengers used only if procedures require • Simulate normal takeoff and climb to cruise • Captain will order crew to prepare for ditching • After 6 minutes simulated landing on water • Observe life preserver donning and life raft removal • One life raft will be selected for launch

  9. EVALUATION OF DEMONSTRATION • Adequate equipment properly stowed • Slides, life jackets, rafts inflate as required • Crew use of correct procedures - training • Timely evacuation of aircraft • Time start to exit opening, life raft launched/inflated and when all rafts are boarded

More Related