PG&E’s 2013 SmartAC Program Evaluation

PG&E’s 2013 SmartAC Program Evaluation. Dr. Stephen George DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014. Agenda. Program overview Ex post methodology and results Ex Ante methodology and results Relationship between ex post and ex ante.

cayla
Download Presentation

PG&E’s 2013 SmartAC Program Evaluation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PG&E’s 2013 SmartAC Program Evaluation Dr. Stephen George DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014

  2. Agenda • Program overview • Ex post methodology and results • Ex Ante methodology and results • Relationship between ex post and ex ante

  3. Overview of PG&E’s SmartAC Program • AC load control through installation of control devices that limit the duty cycles of AC units • Two types of devices: switches and PCTs • Events called between May 1st and October 31st, up to 6 hours or less in each event, for a maximum of 100 hours per season: • For testing purposes • Based on an economic trigger • For emergency or in anticipation of emergency conditions • 151,000 residential accounts with 168,000 control devices • Roughly 39,000 accounts and 43,000 devices dually enrolled in SmartRate – ex post impacts for this group are included in SmartRate evaluation but ex ante impacts on SmartAC only days included here • 5,800 SMB accounts with 9,000 control devices • Closed to new enrollment since 2011

  4. SmartAC ex post events in 2013 • Two test events were called in 2013 for residential SmartAC only accounts (none were called for SMB accounts) • A series of one-hour test events on July 1, using different control and treatment groups for each hour, spanning the hours from 10 AM to 8 PM designed to assess how impacts differ for hours inside and outside the traditional resource adequacy (RA) window • A one hour test event on September 9, from 2 to 3 PM • Four events were called at the sub-LAP level in response to local emergency conditions • East Bay on June 7 • Los Padres on July 2 • Geysers on July 3 • North Coast on July 3

  5. Ex post impacts for test events were based on the difference in loads between large (~12,000), randomly chosen treatment & control groups that are near perfect clones Loads for each randomly chosen group on July 11, 2012 event day

  6. Load impactsduring the July 1st multi-hour test events varied significantly across hours in the day • Average impacts leading up to RA window were significantly less than during RA window • Reference load between 11 AM and noon is ½ what it is from 5 to 6 PM and load impact is 1/6 of what it is from 5 to 6 • Average impacts in later evening hours were comparable to those during the RA window • PG&E plans to conduct more tests spanning these hours in 2014 RA Window (1 to 6 PM)

  7. Ex Ante Methodology • The ex ante load impact requirements are to produce forecasts for specified weather conditions and event window • 1-in-2 year weather conditions • 1-in-10 year weather conditions • The basic approach is to use ex post impacts as input to a model describing the relationship between impacts and temperature • Model was estimated on pooled data from 2011, 2012 and 2013 • Future enrollment predicted to increase from 151,000 to 58,000 in 2015 and then stay constant until 2024 • Similar methods were used for both residential and SMB • Ex post impacts for SMB were taken from 2011 events since no test events were called in 2012 or 2013 • Enrollment forecasted to decline steadily from around 5,000 in 2014 to roughly 3,800 in 2024

  8. Ex Ante Methodology • Foursteps: • Create weighted average ex post estimates combining SmartAC only and dually enrolled ex post estimates for each LCA for 2011, 2012 and 2013 using 2013 participant weights • Regress 4-5 PM ex post impacts at LCA-level on LCA-specific customer-weighted average temperature from midnight to 5 PM (mean17) – a single regression was run pooling data across LCAs as testing showed that the relationship between mean17 and load impacts was consistent across LCAs • Use regression to predict impacts from 4-5 PM under ex ante conditions • Predict impacts for other hours (1-4 PM, 5-6 PM) based on observed ratios between impact at 4-5 PM and impact at each other hour (ratios are LCA-specific and vary with temperature) • Commercial model is essentially the same, but makes concessions for smaller sample sizes • LCA-specific temperatures, but one model across all LCAs using 2011 data

  9. Ex Ante Methodology Comparing ex ante and ex post estimates by LCA shows how often ex ante impacts are outside the historical range for some LCAs Average Event Impacts From 4-5 PM Versus Mean17 Across All LCAs (2011, 2012 and 2013)

  10. SmartAC Residential Ex Ante Impacts • Greatest aggregate load impact from 1 to 6 PM under 1-2 year conditions – 93MW – is on the July system peak day • The highest hourly impact under 1-in-2 year weather conditions is 125 MW • Under 1-in-10 year weather conditions, the average impact from 1 to 6 pm – 109 – is also predicted to occur on the July system peak day • The maximum hourly impact under 1-in-10 year conditions is estimated to equal 133 MW • Estimates are about 10% lower than last year’s estimates • Increase of dually enrolled from 18% to 26% reduces average • Did not gross up 1st hour for switch ramp in Aggregate Impacts Based on 2014 Projected Enrollment of 156,800

  11. Relationship Between Ex Post and Ex Ante Estimates

  12. For comments or questions, contact:Stephen GeorgeSenior Vice President, Utility Servicessgeorge@nexant.comorChristine HartmannProject Analystchartmann@nexant.comNexant, Inc.101 Montgomery St., 15th FloorSan Francisco, CA 94104415-777-0707