90 likes | 248 Views
ERCOT AMS Report. February 2014 Data. ERCOT ADVANCED METER METHODS. AMC – Advanced Meter Current (data supplied by TDSP) AME – Advanced Meter Estimated (estimated by ERCOT with historical data)
E N D
ERCOT AMS Report February 2014 Data AMS Workshop III September 19, 2014
ERCOT ADVANCED METER METHODS • AMC – Advanced Meter Current (data supplied by TDSP) • AME – Advanced Meter Estimated (estimated by ERCOT with historical data) • AMDP – Advanced Meter Default Profile (estimated by ERCOT with backcast profile – no data within 12 months of operating date) • AMDPS – Advanced Meter Default Profile Scaled (estimated by ERCOT with a scaled backcast profile – ESI ID is transitioning from NIDR to AMS) AMS Workshop III
Load Volume Change of TDSP Submitted Data (MWH) MWH Change = Most Recent – Prior Method = AMC AMS Workshop III
Load Volume Percent Change of TDSP Submitted Data %Change = ((Most Recent – Prior)/Prior) * 100 Method = AMC AMS Workshop III
Load Volume Estimated by ERCOT (MWH) MWH = AME+AMDP+AMDPS volumes AMS Workshop III
Load Volume Percentage Estimated by ERCOT % = ((AME+AMDP+AMDPS volumes) / (AMC+AME+AMDP+AMDPS volumes))*100 AMS Workshop III
ESI ID Count Estimated by ERCOT COUNT = AME+AMDP+AMDPS AMS Workshop III
ESI ID Count Percentage Estimated by ERCOT % = ((AME+AMDP+AMDPS counts) / (AMC+AME+AMDP+AMDPS counts))*100 AMS Workshop III