1 / 12

Annette Henley

Annette Henley. Private Business Systems Unit Radiocommunications Agency 0207 211 0181. Institution of Mechanical Engineers, 20th June 2002. 5GHz Consultation Process.

charo
Download Presentation

Annette Henley

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Annette Henley Private Business Systems Unit Radiocommunications Agency 0207 211 0181 Institution of Mechanical Engineers, 20th June 2002 SMAG 01/19

  2. 5GHz Consultation Process • Final Stage consultation document and draft Interface Requirement for 5GHz band were published on RA website in mid-December 2001 asking for comments. • Final Stage consultation document contained 4 proposals. • Closing date for comments, 15 February 2002. SMAG 01/19

  3. Proposal 1 • Make all 3 Bands licence exempt • All equipment must meet requirements of appropriate IR . SMAG 01/19

  4. Proposal 2 Band A (5150 - 5350MHz) • all devices will be nomadic/mobile. • All devices should comply to ERC Decision 99(23) and IR 2006. • Indoor Use only. Max EIRP 200mW Band B (5470 - 5725 MHz) • all devices will be nomadic/mobile. Max EIRP 1W • All devices should comply to ERC Decision 99(23) and IR 2006. SMAG 01/19

  5. Band C (5725 - 5875 MHz) • All equipment should comply with IR2006. Max EIRP of 2W. • All Devices Fixed. • IR 2030 with maximum EIRP of 25 mW will still apply. SMAG 01/19

  6. Proposal 3 • Band C ideal candidate to implement a database showing the locations and other technical parameters of stations deployed in this band. • RA to ensure that site information is made publicly available. • The identities of operators would not form part of the publicly available material. SMAG 01/19

  7. Proposal 4 For RLANs without DFS/TPC as standard an interim proposal was made • Maximum EIRP of 50mW without TPC as standard • Maximum EIRP of 200mW with TPC only as standard • Indoor use only in the band 5150-5250 MHz. • This proposal to be reviewed at future date. SMAG 01/19

  8. Summary of Responses • 28 Responses were received. • Non-confidential replies published on RA website. • Majority of negative replies focused on mainly two issues • Use of band C for higher power Fixed services (Proposal 2) • Interim proposals for band A (proposal 4) SMAG 01/19

  9. Interim Solution • IR 2006 to be rewritten without Band C proposals. Band C requires further sharing studies before it can be released • To contain the following conditions. • Band A (5150 - 5350MHz) • all devices will be nomadic/mobile. • All devices should comply to ERC Decision 99(23) and IR 2006. • Indoor Use only. Max EIRP 200mW SMAG 01/19

  10. Band B (5470 - 5725 MHz) • all devices will be nomadic/mobile. Max EIRP 1W • All devices should comply to ERC Decision 99(23) and IR 2006. SMAG 01/19

  11. Reality (as of June 2002) • To open the market quickly IR 2006 to contain the following interim conditions. • Band A (5150 - 5350MHz) • all devices will be nomadic/mobile. • Indoor Use only. • Max EIRP 60mW without TPC • Max EIRP 120mW with TPC (3dB mitigation) • Random Channel Selection Mechanism to cover all Band A. SMAG 01/19

  12. Regulatory Process • New IR 2006 to go for EU notification (3 month process) • Minister submissions to be done in parallel • To decide whether to allow provision of public services in 5GHz • To contain redrafted licence exemption SI • To contain Regulatory Impact Assessment for 5 GHz • Lay Regulations in Parliament by end Sept SMAG 01/19

More Related