An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capital Improvement Task Force Update 09.23.2012

  2. Capital Improvement Task Force • • The Council established the Capital Improvement Task Force (CITF) at the Annual Meeting, held in February 2012. • The charge of the CITF is to assess deferred maintenance and capital improvement needs of our facility and to prepare recommendations for consideration by the congregation.

  3. Teaming With HGA • • At a special congregational meeting in June, the congregation voted to hire the engineering firm of Hammel,Green & Abrahamson (HGA) to help evaluate our issues and develop a long range plan for addressing them. • Our work with HGA began in early June and is being completed this month. • We held six meetings over the summer with HGA.

  4. Our Goals • • At our first meeting with HGA we established our goal – create a “structurally sound, safe, comfortable and dry facility.” • We want to meet this goal by being good stewards of our facility and making wise decisions for the future.

  5. Our Priorities Defined • • Major issues were ranked in the following order: • Roof / Gutter System • Water Drainage / Building Leaks / Erosion • Structural (Building Settlement) • Parking Lot • HVAC / Electrical & Plumbing

  6. Timeline June July August Sept. 23 Discovery & Analysis Range of Options Summary Findings Hired HGA

  7. Summary Findings

  8. Summary Findings

  9. Summary Findings

  10. Summary Findings

  11. Summary Findings

  12. Existing Roof / Gutter Issues Damaged/Missing Tiles Damaged Dormers and Flashing Damaged Gutters

  13. Roof / Gutter Improvements Repair damaged areas Install insulation & replace roof Roof Repairs Insulate Roof

  14. Existing Drainage / Leaks / Erosion –Issues Poor Downspout Function Wet Building Damaged Site

  15. Existing Drainage / Leaks / Erosion –Issues Downspout Locations

  16. Drainage / Leaks / Erosion –Improvements At Grade Discharge: slope away from building Below Grade Collection: gather and route Downspout Solutions

  17. Drainage / Leaks / Erosion –Improvements Rain Garden Gather Downspouts and direct to Raingarden Waterproof Choir Room Foundation Drainage Downspout & Drainage System

  18. Landscape at the Choir Room

  19. Accessible Patio (pedestal pavers) Ornamental Plantings Waterproofed Choir Room Rain Garden Foundation Drainage Downspout and Drainage System

  20. Patio above Choir Room

  21. Memorial Garden Option

  22. Existing Structural Issues Chapel Settlement – Exterior Cracks Interior Cracks

  23. Soil Borings Results- Did discover a clay layer under the chapel, didn’t discover a high water table, did discover sandy soil under parking lot

  24. Survey Elevations at Colonial Room 0.01’ -0.18’ -0.08’

  25. Structural Improvements

  26. Parking Lot

  27. Parking and LandscapingConcept Site Plan

  28. Parking and Landscaping Improvements Rain Gardens Play Areas Improved Parking Lot Trees

  29. Storm Water Management Rain garden Underground storm piping Storm water detention Cistern Infiltrate and retain as much as possible, slowly discharge the rest

  30. Storm Water Management

  31. Mechanical and Electrical Existing Issues Old, but still in workable condition

  32. Preliminary Cost Estimates

  33. Preliminary Cost Estimates Cost Estimates based on HGA’s concept documents

  34. Next Steps - Project 1: Roof and Gutter Repairs • Wednesday, September 26, 6:30 p.m. Informational meeting in the Gathering Space • September 28: Send out RFPs • October 18,19: Interview contractors • November 4: Congregation votes on recommended plan and contractor

  35. Long Range Plan- Project 2: Waterproofing and Stabilization • January 20th, Adult Education: Long range plan presentation and Project #2 Informational Meeting regarding Waterproofing and Stabilization • Spring Building Improvement Campaign