An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction and Structures 2 Tharindu Herath 500129564 Ludwig Mies van der Rohe “LESS IS MORE”

  2. Construction and Structures 2 Base Plates Re-enforced Pad Footing

  3. Construction and Structures 2 Universal Column Universal Column Primary Beam Primary Beam connection with End Plate

  4. Construction and Structures 2 Primary Beam Secondary Beam

  5. Construction and Structures 2 Primary Beam Angle Cleat Secondary Beam Secondary Beam connection to Primary Beam

  6. Construction and Structures 2 Universal Column with end plate connection Primary Beam Secondary Beam

  7. Construction and Structures 2 Bondeck Formwork Bondeck Formwork Bolted on to Secondary beam Secondary Beam

  8. Construction and Structures 2 Concrete Slab Re-enforcement Bondeck Secondary Beam Ground Floor Slab with re-enforcement on Bondeck Formwork

  9. Construction and Structures 2 View of Ground Floor

  10. Construction and Structures 2 • First Floor Construction Process • Same as the ground floor • Primary beam on top of U.C. • Secondary Beams attached to Primary Beam • Bondeck formwork on secondary beams • Re-enforcement • Concrete slab

  11. Construction and Structures 2 Re-enforced Suspended Ceiling connected with steel rods and attached to both the underside of the formwork and secondary beam Steel Rods Suspended Ceiling Re-enforcement

  12. Construction and Structures 2 Roof Constructed the same way as the Ground & 1st Floor. Only difference is that there is a box gutter on the side of the roof

  13. Construction and Structures 2 Bondeck Universal Column End Plate Secondary Beam Primary Beam Window Frame Glazing Concrete Cladding

  14. Construction and Structures 2 “LESS IS MORE” Front View