1 / 13

Detector group organization

Detector group organization. For the CDR writing we had identified subsystem editors/conveners This structure has concluded its function Many thanks for the effort and commitment We should move forward to the next phase Goals: Advance the R&D activity as coherently as possible

ciqala
Download Presentation

Detector group organization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detector group organization • For the CDR writing we had identified subsystem editors/conveners • This structure has concluded its function • Many thanks for the effort and commitment • We should move forward to the next phase • Goals: • Advance the R&D activity as coherently as possible • Start creating the infrastructure and doing the work needed for a Technical Design Report • Prepare the ground for the formation of a collaboration • We need to keep a delicate but essential balance: • Move forward coherently • Leave room for other groups to join Dal CDR al TDR , occorre una Collaborazione

  2. R&D Perspectives • R&D will be funded at the local or regional level until there is a SuperB collaboration. • Groups approach(ed) their funding agencies to get support for what they’re interested in. • Nonetheless now that we have a CDR detector, coordination of activities is important: • Identify the most important R&D issues • Avoid duplication of effort • Act together to ask for money • Provide a structure for new activities or new groups INFN comincera’ a finanziare nel 2008

  3. R&D Coordination • I think it would be useful to setup a structure of R&D conveners for the subsystems with the job of: • Keep track/coordinate activities • Help groups focus on what is needed • Provide a point of reference for groups or individuals wishing to participate • Help prepare funding proposals or reports • Each subsystem should have one or two conveners • Let’s use the rest of this workshop to discuss about names • Not all the vacancies need to be filled now • Not a life sentence: which should allow dynamic adaptation as things evolve Considerazioni (quasi ovvie) al contorno

  4. Subsystems • MDI (including beam pipe) • SVT (including Layer0) • DCH • EMC (including endcaps)(**) • PID (including endcaps)(*) • IFR (**) • Electronics • Trigger/DAQ • Computing • Software Shopping list, * indica possibile interesse nostro

  5. R&D Review and choices • At some point we will need a more formal R&D review process • Committee to review and monitor activity and provide advice to the management • IMHO this should be setup when the collaboration is formed or forming • For some regions it may be advantageous to create this committee earlier • We need to explore the ramifications of this proposal • Eventually we will have to make choices about technology • Usual difficult balance between good that works and better that might not • We should use the time in front of us to develop the new technologies as much as possible • Act together as a group working towards an experiment • Minimize pain and disappointment when choices will actually be made by the SuperB collaboration Ulteriori considerazioni

  6. Software • Simulation • We need to ramp up our simulation ability • More and more detailed • Connection with physics group and accelerator design • Physics studies • Background simulation • Detector studies • Infrastructure • We need to start setting up a software infrastructure (and group) • From repository to framework • We’ve been using SLAC/Babar so far. How much longer ? Questo riguarda tutti, quindi anche noi!

  7. Last but not least • Infrastructure in Tor Vergata • We need to proceed with a feasability study for the Tor Vergata site • It is essential to define building volumes and functions • Experimental hall(s), support buildings and caverns, shafts, assembly halls, … • We have regular meetings with the Tor Vergata engineers and architects • Need input and answers from the Accelerator and Detector group Questo non ci riguarda da vicino, ma e’ vicino!!!!

  8. Per gli amanti della photon detection PID Ratcliff • Three active groups: SLAC, Ljubljana, BINP • DIRC Barrel readout • Forward (Backward PID): TOF, Focusing RICH Projected performance

  9. Forward PID Ratcliff TOF resolution • Physics case • Cost/benefit analysis • Technology choice/maturity • Bench tests of fast timing PMTs are encouraging to date. • Best results with the laser diode: • - s ~ 12 ps for Npe = 50-60 (as expected from 1cm thick Cherenkov radiator). • - s TTS < 26 ps for Npe ~ 1. • - Upper limit on the MCP-PMT contribution: s MCP-PMT < 6.5 ps. • - TAC/ADC contribution to timing: s TAC_ADC < 3.2 ps. • - Total electronics contribution at present: s Total_electronics~ 7.2 ps. • More to come soon….We plan to continue detector work and confirm TOF performance in a test beam run this year….However, test beams at SLAC after this year are a concern. Križan

  10. Forward PID Križan MCP PMT development in BINP • Photocathode ageing is rate dependent • Counting rate was increased from test to test keeping the integrated cathode charge constant (~5 nC) • 3 MCP PMTs have the same life time as 2 MCP with protective layer Kravchenko

  11. EMC Hitlin Active group in CALTECH (Ren-yuan Zhu) Interessa anche PG, PD, sinergia con CMS-Roma

  12. Acceptance studies Mazur • Btn benchmark • Basis for a cost benefit analysis of a backward calorimeter • Need to commission a full detailed study for the TDR BKGD/Signal with smearing Forw acc. BKGD/Signal with smearing Backw. acc.

  13. IFR Cavoto • For the scintillator we are in 2002 (virtually) • No active group (yet) • Need to get going if we want to be ready in time R&D NOW (TO DO) Sinergia con Cuore (+Pd, Fe)

More Related