1 / 2

BLIP operations 03-29-11

BLIP operations 03-29-11. Status – running at 117.5MeV BLIP weekly average beam reduced to 79.2µA purposely. Weekly operations somewhat decreased to 158.8 hours. Isotope production of Sr-82, Ge-68 and irradiation LBNE targets downstream of the isotope targets continues at reduced current.

coen
Download Presentation

BLIP operations 03-29-11

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BLIP operations 03-29-11 Status – running at 117.5MeV BLIP weekly average beam reduced to 79.2µA purposely. Weekly operations somewhat decreased to 158.8 hours. Isotope production of Sr-82, Ge-68 and irradiation LBNE targets downstream of the isotope targets continues at reduced current. Operations issues Ga target has survived ~11d at the significantly reduced current level. However, this also affects yield of Sr-82, which is in high demand. Therefore we will remove the Ga target Monday through Friday and operate at maximum current, then reduce the beam current and install the Ga target on the weekends. The hot cell acid fume scrubber system leaked at a joint in vapor off gas pipe, causing some local contamination on the equipment and the floor. No personnel were contaminated. Decontamination was completed yesterday. A temporary repair with silicone will be attempted while we await new fittings to be ordered and installed.

More Related