Competency: 204.00 Draw Foundation Plans. Objective: 204.03 Explain footing and foundation wall construction. Footings. Wider than foundation wall Purpose Spread entire load of structure over wider area Prevents uneven settlement. Determine Footing Sizes. Live loads include movable items

cvarner
Download Presentation

Competency: 204.00 Draw Foundation Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Competency: 204.00Draw Foundation Plans Objective: 204.03 Explain footing and foundation wall construction.

  2. Footings • Wider than foundation wall • Purpose • Spread entire load of structure over wider area • Prevents uneven settlement

  3. Determine Footing Sizes • Live loads include movable items • People • Wind • Snow • Furniture • Dead loads include all of the structure construction materials • Different soil types • Support varying loads

  4. Footings • Generally made of poured concrete • Trench shapes footing • Forms constructed for unstable soils • Concrete withstands heavy loads • Steel rebar adds support

  5. Footing Design & Construction • Proper design & construction of utmost importance • Larger footings • Aid in prevention of uneven settlement • Different loading conditions • May cause uneven settlement

  6. Footing Design & Construction • Effects of uneven settlement • Doors & windows stick • Cracks in finish materials • Leaks in plumbing • Structural element failure

  7. Frost line • Depth to which the ground will freeze • Depth varies with geographic location • Local codes specify minimum footing depth • Footing placed below frost line • Ground freezes & thaws • Expands and contracts • Footing above frost line will be pushed upward • Causes cracks in foundation

  8. Foundation Wall • Extends from footing upward to first floor • Commonly used materials • Poured concrete • Concrete block • Brick • Tile

  9. Foundation WallPoured Concrete • Composition • Cement • Water • Stone or other aggregrate • Use key to tie walls to poured footing

  10. Foundation WallsConcrete Block • Most common CMU • Nominal size: 8”high x 8”thick x 16” long • Actual size: 7-5/8” x 7-5/8” x 15-3/8” with 3/8” mortar joint • Thickness: 4”, 8”, 10”, 12” • Styles • 2 & 3 core stretchers • Solids • Lintels • Corner • Pilaster • Jamb blocks

  11. Foundation Walls • Thickness varies • Construction factors • Local codes • Soil conditions • Shape is designed to handle horizontal earth movement • Lateral earth shifting causes damage

  12. Foundation Walls • Require damp proofing • Heavy coats of tar or cement based paint • Thin coats of parging • Drain tile • Perforated pipe surrounds structure • Washed gravel holds back soil; allows water to enter pipe • Water is directed away from foundation

  13. Foundation Walls • Polyethylene sheeting • Thickness measured in millimeters (mils) • 6 mil most common