230 likes | 477 Views
BASIC COAL FIRED BOILER ATTENDANCE TRAINING COURSE. TO TRAIN BOILER OPERATORS TO GENERATE STEAM SAFELY, EFFICIENTLY AND COST EFFECTIVELY. OBJECTIVE. Minimum trainee requirements:. Good eye sight. Good hearing. Physically fit and mentally alert. A sober disposition.
E N D
TO TRAIN BOILER OPERATORS TO GENERATE STEAM SAFELY, EFFICIENTLY AND COST EFFECTIVELY OBJECTIVE
Minimum trainee requirements: • Good eye sight. • Good hearing. • Physically fit and mentally alert. • A sober disposition. • Ability to work and move around in confined spaces. • A tolerance to heat, loud noises and heights. • Literate
Dryden Combustion Present: BOILER OPERATOR TRAINING COURSE
BASIC SUBJECTS COVERED DURING THE TRAINING PROGRAMME • Example of some items covered during the Training Course which contribute to the efficient use and correct operation of your boiler
Identifying the component parts by name and knowing their function and how to test them. • Gauge Glasses • Undergrate Dampers • Mobreys • Different Valves • Boiler • Sootblowers • Water treatment • Coal Handling Equipment • Plus more ….
2. Preliminary checks undertaken by the operator before lighting up the boiler and raising steam pressure
PRELIMINARY CHECKS:- • Water level • Coal • Ash removal trolley • Water softener • Chemicals • Grit removal trolley • Valve positions
3. The CORRECT way to light a fire and raise steam pressure:- • Guillotine door height • Length of coal bed • Where to place the wood fire • All other relevant steps up to raising steam pressure
4. Maintaining steam pressure safely and efficiently:- • Understanding correct air fuel ratios • Ash removal • Blowdown Procedure • and more…… cost impact saving approximately 10% of your current coal costs
Banking the fire correctly:- • Correct tools to complete the task • Proper personal protection equipment for the tasks • Advantages:- - Not to make a fire from start up again - Raise steam pressure without causing stress to the boiler.
Starting up from a banked fire:- • Procedure on how to re-ignite correctly • Valve Positions • Damper Settings
Emergency procedures:- • Power failure • Safety valve blowoff • Shear pin failure • Broken gauge glass • Blowdown valve jams in the open position
Shutdown and standby procedure:- • Correct shutting down of a boiler for more than 18 hours. • Short standby (30 mins or less)
Problems and remedies:- • Identification of problem • Diagnosis of problem and apply correct remedies. • Protecting the boiler • Do not waste time and coal
BASIC BOILER OPERATORS COURSE • Preliminary Exam Written to Evaluate each Trainees Capability • Course conducted in English by a multi-lingual SETA registered Facilitator • Theory – conducted in a classroom together with DVD presentations Written Report issued to the Department on each student • Practical training – conducted in the boiler house • Final Exam • Examinations evaluated by a SETA registered Assessor • Issuing of Certificate • Boiler Operator Cap to successful students
COURSE OPTIONS • Individual “on site” training course to be run at your factory on your boiler or On site training of operators – backed up by the DVD Training Course – which shall remain on site for constant refresher courses for the operators at no additional cost • Purchase DVD Training Course. Course to be owned and run by the client, in their own time. Future training / refresher courses will then be at no additional costs to the Company or
DURATION OF EACH COURSE • Each Course will take 5 days (40 hours) • Traveling to and from site will be additional
REQUIREMENTS 1. Classroom complete with tables and chairs, white board and markers 2. Availability of fully operational stand-by boiler for start / stop operation during practical training 3. Recommendation of a maximum of 8 students per class