Proposed Wiring Plan

Wire for 32 position lab (adding 12) Leave the existing color printer. ... Library already has network wiring/Internet access. Install 32 drops in the new lab. ...

Download Presentation

Proposed Wiring Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    Slide 1:Proposed Wiring Plan

    Slide 2:Bell High School Single story – under one roofBell High School Single story – under one roof

    Location of Wiring Closets - Wiring Closets

    Slide 3:5 wiring closets spaced out Main closet in 2E T1 line Router 5 wiring closets spaced out Main closet in 2E T1 line Router

    Lab 1 One 20 position lab that is networked within the classroom using peer-to-peer with two shared printers for remediation to prepare students for LEAP and GEE. Wire for 32 position lab Disperse 2 shared printers to classrooms Buy a network printer

    Slide 4:20 position lab that is networked within the classroom using peer to peer with two shared printer for remediation to prepare students for the LEAP and GEE Wire for 32 position lab Disperse 2 shared printer to classrooms Buy a network printer 20 position lab that is networked within the classroom using peer to peer with two shared printer for remediation to prepare students for the LEAP and GEE Wire for 32 position lab Disperse 2 shared printer to classrooms Buy a network printer

    Wire for 32 position lab Disperse 10 existing printers to classrooms Buy a network printer. Install NIC Cards in existing computers (20) One 20 position lab that is NOT networked but has one switched printer for each two computers (10 printers total) in the business department. Lab 2

    Slide 5:One 20 position lab that is NOT networked but has one switched printer for each two computer (10 printers total) in the business department. Wire for 32 position lab Disperse 10 existing printers to classrooms Buy a network printer Install NIC cards in existing computers (20) One 20 position lab that is NOT networked but has one switched printer for each two computer (10 printers total) in the business department. Wire for 32 position lab Disperse 10 existing printers to classrooms Buy a network printer Install NIC cards in existing computers (20)

    Lab 3 The ornery art department (sorry Dede) has 10 Macs and they refuse to give them up. They are currently networked with Appletalk and one color printer. Wire for 32 position lab (adding 12) Leave the existing color printer.

    Slide 6:Art department – 10 Macs Currently networked with Appletalk One color printer Wire for 32 position lab Leave the existing color printer Art department – 10 Macs Currently networked with Appletalk One color printer Wire for 32 position lab Leave the existing color printer

    New Lab Network Segment -Administrative Offices Administrative Segment Administrative Offices have been previously wired. Wire for 8 drops in Room 1S. Wire for 32 drops in Room 3S (LEAP Lab). Switches Needed = Total of 3 Network Segment - East A East A Segment Install 8 drops in each of the 13 classrooms. Install 32 drops in the business lab. Total drops will equal 136. Install 7 switches in the wiring closet. Network Segment - East B East B Segment Install 8 drops in each of the 9 classrooms. Library already has network wiring/Internet access. Install 32 drops in the new lab. Total drops will equal 112. Install 6 switches in the wiring closet. Network Segment – West B West B Segment Install 8 drops in each of the 4 classrooms Install 4 drops in Room 4G. Install 4 drops in Room 6G. Install 4 drops in Stage Area. Install 4 drops in Cafeteria. Install 4 drops in Kitchen. Total drops will equal 52. Install 3 switches in the wiring closet. Network Segment - West A West A Segment Install 12 additional drops in Room 4W – Appletalk Lab. Install 8 drops in Room 6W- Shop. Install 8 drops in Tech Class Room. Install 32 drops in Room 8W – Tech Lab. Total new drops will equal 60. (80 total drops) Install 3 switches in the wiring closet.