An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Great Western CorridorFeasibility Study Yavapai County Board of Supervisors April 5, 2010

  2. Central Yavapai Metropolitan Planning Organization (CYMPO) Based on previous studies dating back to 1995 and the 2006 CYMPO study, a need for a new high capacity access controlled roadway was identified to meet year 2030 traffic demands. Arizona Department of Transportation (ADOT) Transportation Investment Strategy identified the need for Great Western/Glassford Hill Corridor to meet future traffic demands. Yavapai County Taking the lead to further study the Great Western Corridor for a future controlled access roadway. Project History

  3. Oct 2008 – Study initiated Feb 2009 – Agency Scoping Meeting and Public Open House July 2009 – Public Information Open House to present alternatives Sept 2009 – Preferred Corridor Alignment selected March 2010 – Feasibility Study, 15% Plans, and Environmental Overview complete Project Schedule

  4. Regional Map Great Western Study Corridor

  5. Project Location Granite Dells Pkwy Willow Creek Glassford Hill Rd

  6. Need for a regional system as identified by CYMPO, Yavapai County, and ADOT Continual coordination with agencies, community, and stakeholders Define the future controlled access roadway needed to efficiently move regional traffic Evaluate the environmental impacts of the preferred roadway corridor Prepare Feasibility Study and 15% design plans to identify future right-of-way requirements No construction funding Project Overview

  7. Stakeholders • Yavapai County Public Works • ADOT Prescott District • ADOT Roadway • ADOT PreDesign • ADOT Environmental • FHWA • City of Prescott • Town of Prescott Valley • Town of Chino Valley • AZ Game & Fish Department • AZ Fish & Wildlife • Arizona State Land Department • Granite Dells Estates (Fann) • Granite Dells Ranch (Cavan) • Deep Well Ranch (James) • Cortez Enterprises

  8. 2030 Projected Traffic Volumes Future Traffic 80,000 57,000 64,000 91,000 106,000

  9. Recommended Typical Section

  10. Alternative Alignments Outer Loop Rd Road 5 South

  11. Alternative Evaluation Matrix Evaluation Categories - Economic Development- Engineering Considerations - Construction & Maintenance Costs - Transportation Systems - Environmental Considerations

  12. Preferred Alternative Alignment Features - 2nd shortest alignment- Minimal utility conflicts- Least potential fragmentation of pronghorn antelope habitat- Furthest alignment from existing residential

  13. Preferred Corridor Alignment Future Chino Valley Extension Road 5 South Future Outer Loop Extension & SR 89 Interchange Great Western Extension Granite Dells Pkwy Glassford Hill Rd Future SR 89A System Interchange

  14. Recommended Phasing Phase 1 - Great Western local diamond interchange on SR 89A - Limited access road - 1st interchange (by developers) Future Chino Valley Extension & System Interchange Road 5 South Future Outer Loop Rd Extension & SR 89 Interchange Phase 2 - 1st segment of Great Western Extension (4 lanes) - 2nd interchange (by developers) - Great Western on/off ramps Phase 3 - Remaining segment of Great Western Extension - Granite Creek Bridge - At-grade intersection at SR 89 Great Western Phase 4 - 3rd interchange (by developers) Phase 5 - Future SR 89A Interchange (configuration TBD) Granite Dells Glassford Hill

  15. Final Study Products • Existing Drainage Report • Technical Memo re: Granite Creek Crossing Analysis • Traffic Report • Feasibility Study • Environmental Overview • 15% Design Plans

  16. http://www.co.yavapai.az.us/PubWorks.aspx Questions and Comments Thank you! For more information please visit the Yavapai County Web site: