1 / 17

Murli K. Adury Youssef Dehghani Cathy Strombom Parsons Brinckerhoff Quade & Douglas, Inc.

A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM. Murli K. Adury Youssef Dehghani Cathy Strombom Parsons Brinckerhoff Quade & Douglas, Inc. Seattle, WA, USA. Project Context. I-405 Corridor Program:

Download Presentation

Murli K. Adury Youssef Dehghani Cathy Strombom Parsons Brinckerhoff Quade & Douglas, Inc.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM Murli K. Adury Youssef Dehghani Cathy Strombom Parsons Brinckerhoff Quade & Douglas, Inc. Seattle, WA, USA

  2. Project Context • I-405 Corridor Program: • I-405 was built in 70s to alleviate congestion along I-5 • Experiencing unexpectedly high rate of growth from high tech sector (e.g., Microsoft) within I-405 corridor – resulting in high levels of congestion • Undertaking comprehensive alternatives analysis

  3. Project Area Map

  4. Why Micro Simulation? • Be able to evaluate realty checks on capacity enhancement elements of the preferred alternative – balancing capacity needs on arterials vs. I-405 thru better diversion mechanism • Be able to refine and/or modifycapacity enhancement elements of the preferred alternative • Be able to highlight potential deficiencies – e.g., lid concept thru downtown Bellevue

  5. Why Integration? • WSDOT undertook a rigorous evaluation of the existing micro simulation software programs • Integration most suited because of its capabilities for: • Micro simulation analysis at corridor level • Equilibrium route diversion analysis • State-of-the-artmethodology for traffic simulation analysis • Being able to interface with the existing regional planning model databases

  6. Model Development Process • Network preparation/calibration • Data collection • Details of network geometry • Signal timings • Traffic counts • Trip table development • Model validation analysis • Model application

  7. Network Development • Included only: • I-405 & major parallel arterials (3000 links) • Major intersections (100 signalized intersections) • Initially used default parameters & refined further during validation process • Most difficult tasks: • Developing a network to fit INTEGRATION limits • Data input for microsimulation – lane geometry, signal data, turn pockets, physical attributes of roadway system

  8. Trip Table Development • Regional model produced PM peak (hour) vehicle trip tables for HOVs and Non-HOVs • Post regional modeling procedure: • Direction peak-hour base year counts were seeded on designated links on I-405 and arterials • Matrix adjustment macro DEMADJ.MAC developed Heinz Spiess was used to update original matrix • Resulting O-D matrix was imported into the Integration model environment

  9. Model Validation Analysis • Initial analysis indicated that study area network needed to be streamlined: • Secondary arterials were removed • Secondary signalized intersections were also removed • Hourly counts exhibited wide variations across weekdays and months: • Overall average and max/min limits were established • Attempts were made to “optimize” signal timing coordination

  10. Model Validation Analysis- Continued - • Prepared summary system-wide measure: • Peak-hour demand input as % of total demand • % vehicles reached destinations • VMTs/VHTs • Total delays & stop delays • Prepared link-level summaries: • Total flow • Travel time • Queue length

  11. Model Validation Analysis- Continued -

  12. Model Validation Analysis- Continued - • Comparative analysis of queue build-up against recurring bottleneck areas posted on the WSDOT website • Performed additional network refinement accordingly • Accomplished reasonable base year validation results

  13. Model Validation Analysis- Continued -

  14. Model Application • In I-405 EMME/2 Model • Developed 2020 network for the preferred alternative • Prepared 2020 Travel Forecasts • Developed 2020 peak-hour trip table • Prepared base year to 2020 zone-to-zone growth rates • Applied implied zone-to-zone growth rate to the base year adjusted peak-hour trip table

  15. Model Application- Continued - • Provided insights into the alternatives analysis process • Highlighted initially proposed improvement plan/conceptual design deficiencies within the project corridor • Identified potential bottleneck areas • Integration modeling achieved its purpose

  16. Lessons Learned • Allow adequate time to: • Define objectives for why needing to do micro simulation and for what purpose • Identify appropriate software program and its limits accordingly • Identify study area carefully for: • Boundaries • Network details (no. of links & intersections)

  17. Lessons Learned - Continued • Assess potential interface with other tools (e.g., regional model databases, network editing, etc.) • Trip matrices need to go through an adjustment process reflecting actual counts • Assess data needs carefully • Micro simulation model is data hungry & time consuming