1 / 27

BUILDING IN ANTAKYA

BUILDING IN ANTAKYA. Information about the Building. Building consists of b asement + g round+8 t ypical floors . ( n o RC w alls at basement ) Built in 1973 Existing m aterial p roperties : C10 / S220 Storey h eights : Basement f loor – 3.6 m Ground f loor – 4.8 m

diamond
Download Presentation

BUILDING IN ANTAKYA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BUILDING IN ANTAKYA

  2. Information about the Building • Buildingconsists of basement +ground+8 typicalfloors. (no RC walls at basement) • Built in 1973 • Existingmaterialproperties: C10 / S220 • Storeyheights : • Basementfloor – 3.6 m • Groundfloor – 4.8 m • Typicalstoreys – 3 m • Total buildingheight – 28.8 m • EarthquakeZone : 1 , SoilType : Z2 • Lateralloadresistingsystemconsists of frames. There is no “RC Wall”

  3. Typical Floor Plan 21 m 24 m

  4. Assessment Summary of the Existing Building

  5. Assessment Summary of the Existing Building

  6. Added RC Walls – Basement & Ground Floor

  7. Added RC Walls + CFRP Reinforced HCT Walls

  8. Assessment Summary – Strengthened Building

  9. Assessment Summary – Strengthened Building

  10. Demand/Capacity Ratios for HCT Walls with CFRP

  11. Demand/Capacity Ratios for HCT Walls with CFRP

  12. Pushover Analyses Results

  13. Concluding Remarks • Proposed rehabilitation technique satisfies current TEC requirements. • Rehabilitation work was started in October 2008. • It is user friendly technique. Building is not evacuated. • CFRP application is completed in 2.5 months. • RC wall application lasted for 5 months.

  14. RC WALL Construction

  15. Basement & Ground Floor Corrosion Repair

  16. CFRP Application on HRC Infills

  17. Daily life did not stop

  18. Thank you for your attention

More Related