1 / 16

Creation Process:

Creation Process: A “Life Cycle” Approach to Concept thru Fabrication/ Production. • Pre-determined Sites/Planning • Access Control • Perimeter Control • Population and Visitor Management • Match Asset Availability with Population

dillian
Download Presentation

Creation Process:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Creation Process: A “Life Cycle” Approach to Concept thru Fabrication/Production •Pre-determined Sites/Planning •Access Control •Perimeter Control •Population andVisitor Management • Match Asset Availability with Population • Cradle to Grave – Design thru Implementation • Engineering • Fabrication • Mass Production • User Deployability • Life Cycle Asset Management

  2. The Modular SMT iBunker™ iFORTRESS: PRODUCTS THAT PROTECT MISSION CRITICAL TECHNOLOGY AND ASSETS, PREVENTING INCIDENTS FROM BECOMING EVENTS WITH: THE MODULAR MCF iFORTRESS™ MODULAR, PANELIZED ENCLOSURES THAT SURROUND AND CONTAIN MISSION CRITICAL FACILITIES, PREVENTING HUMAN OR ENVIRONMENTALLY CAUSED FAILURE BY PROVIDING AN UNCOMPROMISED LEVEL OF STRUCTURAL SECURITY™

  3. • THE iMARC™ iFORTRESS PRODUCT LINE • THE iMODAL iFORTRESS™ • THE i19/i23 RACK BUNKER™ Self contained Watertight MT Resistant Secure

  4. The iFORTRESS Modular TranShelter™ iFORTRESS PRODUCT LINE

  5. RESPONSE AND DESIGN CRITERIA Challenges Faced: • Displaced Population • Separated Families/Friends • Fear/Panic • Civil Unrest • Lack of: • Community • Belonging • Order • Where to go/What to do • Services • Medical • Police • Communications • Postal • Basic Human Provisions • Food/Water/Power • Shelter Prime Objective: Determine most beneficial, least cost option available to manage, secure, own, and operate FEMA’s short term and long term “Crisis Management Assets”.

  6. RESPONSE AND DESIGN CRITERIA Challenges Faced with a Disaster of Mass/Societal Scale • Anticipate Complex Psycho-Social, fGeographical, Environmental, Economic .dynamics • Provide Sense of Preparedness • Re-Establish Authority/Services • Re-Establish Community • Create Order/Familiarity • Provide Shelters that provide jtruesense of Thought/Care/Security • Provide rapidly deployed, dscalable, and orderly solutions/settings • Allocate structural resources/assets that are: • Effective • Flexible • Manageable • Can be easily Inventoried/Maintained • Re-deployable

  7. Excellence Without Exception • Modular • Factory Engineered • Rapidly Deployed • Intuitive • Few Tools • Few Men (Manpower) • Structural Security™ • Fully Tested/Comprehensive Assembly • Four Principles of Structural Security™ • Structural • Hydro-dynamic • Fire/Thermal • Environmental iFORTRESS PHILOSOPHY

  8. The iFORTRESS Modular TranShelter™ Conceptual Inspiration Plus Purpose • Transportable • Road/Sea/Air • Self-contained • Lightweight • Quickly Deployed • Weather tight (r49) • Manageable Asset – Bar coded - CMMS

  9. The iFORTRESS Modular TranShelter™ • 20’ or 40’ • Modular TranShelter™ t tethered or lifted off trailer • Self contained 1,200 Ft²

  10. Interlocking Panels • Internal “Bunk” System • Low voltage Int/Ext lighting (Battery) • Fixed Exterior Monitoring Devices • “GREEN” Environmentals The iFORTRESS Modular TranShelter™ • 20’ or 40’ • Modular TranShelter™ t tethered off trailer • Self contained 1,200 Ft² • Accommodate 1 – 72 Occupants

  11. Reverse process • Modular TranShelter™ t return to inventory/maintenance • PDA Manageable • Scan condition/damage • Determine Inventory or Maintenance • Maintain inventory at Territorial Logistic f Center (TLC) for Storage/Re-deployment The iFORTRESS Modular TranShelter™

  12. SHORT/LONG TERM iModal™ iModal™ surgical supplies SITUATION - ASSET MANAGEMENT FOOD FOOD SUPPLIES • 89 FAMILIES TO 6,408 INDIVIDUALS • APPRX. 20 ACRES iModal™ iModal™ iModal™ • (89) RESIDENTIAL SSKU: MTRD 4030 • (3) MED. CLINIC S SKU: MTMC 4030 • (1) SURGICAL iMODAL™S SKU: iMSG 4030 • Psycho-Socio: • Understanding • Compassion • Restoration of.civil order with: • Familiarity • Community • “Real” care • Communication • Services • (1) MED SPPLY iMODAL™S SKU: iMSY 4030 SUPPLIES • (3) POLICE COMMAND S SKU: MTPC 4030 6 4 2 • (3) COMMAND iMODAL™S SKU: iMCD 4030 7 • (4) GENERAL SUPPLYS SKU: MTSY 4030 5 3 1 • (2) MED. RESIDENTIAL S SKU: MTMR 4030 • (1) POLICE RESIDENTIAL S SKU: MTPR 4030 Apprx. 1/8 mile SECOND ST. 3RD AVE 2ND AVE MAIN ST. 1ST AVE FIRST ST. WELCOME - PROCESSING CENTER US POST OFFICE Apprx. ¼ mile • Economical

  13. SHORT/LONGTERM SITUATION - ASSET MANAGEMENT • 89 FAMILIES TO 6,408 INDIVIDUALS • APPRX. 20 ACRES • (89) RESIDENTIAL SSKU: MTRD 4030 • (3) MED. CLINIC S SKU: MTMC 4030 • (1) SURGICAL iMODAL™S SKU: iMSG 4030 • (1) MED SPPLY iMODAL™S SKU: iMSY 4030 • (3) POLICE COMMAND S SKU: MTPC 4030 • (3) COMMAND iMODAL™S SKU: iMCD 4030 • (1) GENERAL SUPPLYS SKU: MTSY 4030 PROTECTED – SELF CONTAINED INVENTORY TERRITORIAL LOGISTICAL CENTER (TLC) CMMS: INVENTORY MANAGEMENT SYSTEM MAINTENANCE

  14. • “Keep Everyone . in the . Neighborhood” • “Both Sides of . the River.” • Stackability in . Deployment – . City Application • Sense of . Community • Visitor vs. . Indigent Population . Behavior Management

  15. Excellence Without Exception • Modular TranShelter™ • Standardized/Familiar (Home-like) Setting • Create community environments • Main Street/1st Avenue • Provide Entry Points • Assign Residence (1 Main St) • Create Rations Depot (General Stores) • iFortress iModal™ • Create sterile medical facilities • Establish Police and Communication NOCS • Deploy Secure Frontline IT infrastructure • i19/i23 Rack Bunker™ • Distributed Communication HUB’s • Secure Remote Facilities

  16. LEAST COST OF OWNERSHIP iFortress Provide: • Greatest Degree of Efficiency • Lower Operating Cost • Tax Benefit • 2 to 5 year Lease Options * • Operating vs Capital Expense • Greatest Degree of Risk Mitigation • Engineered – Tested – Proven • Disaster Preparedness • Evolutionary paradigm • Greatest Degree of Flexibility • Modular and Life Cycle Approach • Inventory and Re-deployment Capable • Manageable Asset versus sunk or lost cost acquisitions To be a part of the Structural Security™ evolution go to www.ifortress.com

More Related