1 / 15

Proposal for Renovation Project b. 151

EL-TC 27.4.2005. 1. Overview 2. Photos of old installation 3. Outline of new project 4. Budget 5. Conclusions. Proposal for Renovation Project b. 151. K. KAHLE, TS-EL. 1. Project Overview. b. 151. PS Test (2006). ME6. 3 MeV (2006). LEIR (2005). LINAC 4 (2008). b. 152. b. 150.

Download Presentation

Proposal for Renovation Project b. 151

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EL-TC 27.4.2005 1. Overview 2. Photos of old installation 3. Outline of new project 4. Budget 5. Conclusions Proposal for Renovation Project b. 151 K. KAHLE, TS-EL

  2. 1. Project Overview b. 151 PS Test (2006) ME6 3 MeV (2006) LEIR (2005) LINAC 4 (2008) b. 152 b. 150

  3. 1. Overview • Hall 151: • Test of PS magnets • Test of RF equipment

  4. 2. Old installation EBD13*SHC - obsolete

  5. 2. Old installation EBD11*SHC - obsolete

  6. 2. Old installation EBD30 and EBD31*SHC - obsolete

  7. 2. Old installation Disconnected OIL CABLE in the cable duct

  8. 2. Old installation Old switchboard, disconnected

  9. 2. Old installation Spaghetti Bolognese

  10. 2. Old installation The purple snake

  11. 2. Old installation Socket box - obsolete

  12. 3. Outline of new project • dismantle obsolete switchboards • (ERD30*SHC, ERD31*SHC, EBD11*SHC, EBD13*SHC, EBD14*SHC) • NEW: one single switchboard 1000A (type EBD) • existing incoming cables remain (200m x 11 PVC 240 Cu from b.264) • this would free feeders from s/st ME6 • OPTION: • one large switchboard ERD + one switchboard EBD for Gen. Serv. • clean all cable ducts, dismantle unused cables • replace all outgoing cables from the new switchboard • remove all oil cables in the zone

  13. 4. Budget

  14. 5. Conclusion • Project is necessary: Safety Reasons • Project Duration 6 months • no manpower available • Project is defined now • START depending on available manpower + budget

  15. Questions ? Thank you.

More Related