An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preliminary Design Review forThe SNS Video Profile Monitor SystemDave GassnerBrookhaven National Laboratory Part I: Overview

  2. Part I. Overview • Summary: • Analyze the light emitted from the primary and secondary stripping foils. • Two rad-hard video camera systems with image processing electronics. • Phosphor screens can be inserted for beam profile measurements (reduced intensity). • Foil illumination by a lamp during the absence of beam will allow visual inspection to confirm the foil integrity. • Status: • Preliminary Design Stage • Investigating the possible information which can be derived from the spectra of light emitted from the foils. • Evaluating components. SNS VPM PDR

  3. Video Profile Monitor VPM LocationBeam Primary Foil H- Secondary Foil H- & H0 SNS VPM PDR

  4. System Requirements • Operating Modes: • Operations (nominal) • Monitor foil characteristics • Real time image processing • Commissioning • Tuning &Troubleshooting SNS VPM PDR

  5. Baseline Location # Ch #Crates • Ring_Diag:Cab05 2 1 Rack Information SNS VPM PDR

  6. VPM System Schedule SNS VPM PDR

  7. SNS Installation Responsibilities SNS VPM PDR