1 / 15

BA 471 Management Information Systems

BA 471 Management Information Systems. Process Maturity and Quality. Process Maturity and Quality. Process : A set of related tasks performed to achieve an outcome. Process Maturity : Repeatable Formalized Best practices Measured Continuously improved. Process Maturity and Quality.

dotty
Download Presentation

BA 471 Management Information Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BA 471Management InformationSystems Process Maturity and Quality

  2. Process Maturity and Quality • Process: A set of related tasks performed to achieve an outcome. • Process Maturity: • Repeatable • Formalized • Best practices • Measured • Continuously improved

  3. Process Maturity and Quality • Engineering and Process Maturity – Why? • Information Systems and Process Maturity • Why?

  4. Process Maturity and Quality • Process Maturity and IT: • Methodology – organizes work into • Phases • Tasks • Deliverables • Sequence

  5. Process Maturity and Quality • Methodology – Basics

  6. Process Maturity and Quality • Methodology & Deliverables

  7. Software Delivery Process CA Pre-Work Tollgate 0 Analysis High Level Design Tollgate 1 Detail Design/ Construction User Testing Tollgate 2 Deployment • Goal: • Prepare high level project scope • Goal: • Provide Go/NoGo/Redirect Decision • Goal: • Define solution to Business Need • Goal: • Define and Design IT Solution • Goal: • Provide Go/NoGo/Redirect for Construction/Buy • Ready for CA • Goal: • Create IT Solution • Goal: • Test IT Solution • Goal: • Provide Go/NoGo/Redirect for Go Live! • Goal: • Deploy IT Solution • Roles: • PM • BA • User Rep. • Training Dept. • PE • Prod Support • Infr. Rep(s). • Vendor Liaison • Roles: • PM • BA • PE • Infr. Rep(s). • Appl. Dev. • Vendor Liaison • Test Rep. • Roles: • PM • BA • PE • User Rep. • Infr. Rep(s). • Vendor Liaison • Test Team • Roles: • PM • BA • PE • Tech. Lead • Infr. Rep. • Test Rep. • Legal Rep. • Roles: • PM • PE • Bus./Prj. Sponsor • Infr. Rep. • Bus SME • Roles: • Exec Spons. • Sr. IT Mgt. • PM • PE • Infr. Rep. • Roles: • PM • BA • Bus SME • PE • Infr. Rep. • Roles: • Exec Sponsor • Sr. IT Mgt. • PM • PE • BA Rep. • User Reps. • Test Rep. • Arch. Rep. • Vendor Liaison • Roles: • Exec Sponsor • Sr. IT Mgt. • PM • PE • BA • User Reps. • Infr. Rep(s). • Tech Lead • Activities: • Define User Reqs. • Define as-is & to-be Bus. Process (detail) • Activities: • Go Live! • Health Check • Transition to Support • User Training • Create Supporting Docs. • Legal Closeout • Implement Production Support • Lessons Learned • Celebration!! • Activities: • ROM ROI • Determine project scope • Identify as-is & to-be bus. proc. (high-lev) • Acknowledge Resource Needs going forward • Develop Multi-Phase Plan • Materials: • TG0 Summary • TG0 Signoff • Activities: • Design Solution • Build vs. Buy considerations • Activities: • Prepare Envs.(Dev, QA, Prod) • Develop Product • Unit Test • System Readiness Testing • Load Testing • Activities: • Alpha Test • Beta Test • User Acceptance Testing • Materials: • TG2 Summary • TG2 Signoff • Reviews: • Design • Risk • Architecture • Conference Room Pilot • Legal • Conversion Plan Review • Reviews: • Risk • User Reqs. • PowerPoint UI • Materials: • TG1 Summary • TG1 Signoff Obtain CA Approval • Reviews: • UAT Review • Reviews: • Deployment Readiness Review • Training Review • SLA. for Prod Support • Reviews: • System Readiness Test Review • Materials: • Software Support Docs. • Release Notes. • User Manuals • User Acceptance Docs. • Lessons Learned • Test Docs. • Materials: • PM docs: Project Plan, Risk List, issues list, Comm. Plan, Change Mgt. Plan, MGPP, etc. • Process flow • User Reqs. • Conf. Room Demo • Production Support SLA • Reviews: • Technical • Project • Materials: • Detailed Design Docs. • Detailed Project Plan • Training Plan • Conference Room Pilot • PM docs • Test Approach • Materials: • Post Production Review Approval • Signoff Approvals as appropriate • Project Post Mort. • Materials: • Product • Test Docs. • Testing Approach • Deployment Plan • Project Plan • Materials: • Project Request • Inf Eng Req (v.TG0) • High Level Project Plan

  8. Process Maturity and Quality • Process Maturity • Takes time to develop • “Process” has a mixed reputation – Why?

  9. Process Maturity and Quality • Process Maturity Levels Optimized Managed Defined Repeatable Initial

  10. Process Maturity and Quality • Assessments and Standards for Process • CMMi • Six Sigma • ISO 9000 • CobIT • ITIL

  11. Process Maturity and Quality • Process v. Product • Quality Assurance: • How good is your process? • Quality Control • How good is your product?

  12. Process Maturity and Quality • Measuring Quality • Product • “How well does the finish product meet the customer’s expectations?” • Count defects and map to source • Requirements • Design • Implementation

  13. Process Maturity and Quality • Measuring Product Quality

  14. Process Maturity and Quality • Measuring Process Quality • Not quite as precise/mathematical • Reviewers evaluate maturity; rate

  15. Process Maturity and Quality • The Pros and Cons of “Process” and Process Maturity

More Related