1 / 4

Merge – NB SR 1 to NB I-95 (AM)

N. 3. 2. 1. 4. I-95 / SR 1 Interchange. Existing Locations Operating at Unacceptable LOS. Failing Locations Under Existing Conditions. Merge – NB SR 1 to NB I-95 (AM). 1. Freeway – I-95 NB, north of SR 1 (AM). 2. Weave – SB I-95 C-D Road (PM). 3. Weave – SB SR 1 at I-95 (PM). 4.

drew
Download Presentation

Merge – NB SR 1 to NB I-95 (AM)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. N 3 2 1 4 I-95 / SR 1 Interchange Existing Locations Operating at Unacceptable LOS Failing Locations Under Existing Conditions Merge – NB SR 1 to NB I-95 (AM) 1 Freeway – I-95 NB, north of SR 1 (AM) 2 Weave – SB I-95 C-D Road (PM) 3 Weave – SB SR 1 at I-95 (PM) 4 Click for next slide

  2. N 5 3 2 1 4 7 6 I-95 / SR 1 Interchange Future Locations Operating at Unacceptable LOS Failing Locations Under Existing Conditions Merge – NB SR 1 to NB I-95 (AM) 1 Freeway – I-95 NB, north of SR 1 (AM) 2 Weave – SB I-95 C-D Road (PM) 3 Weave – SB SR 1 at I-95 (PM) 4 Additional Failing Locations Under Future Conditions Diverge – SB I-95 to SR 1 C-D Road (PM) 5 Merge – Road A to SR 1 NB (AM) 6 Weave – NB SR 1 between Mall & I-95 (AM) 7 Click for next slide

  3. N 5 3 2 1 4 7 9 10 6 I-95 / SR 1 Interchange Future Locations Operating at Unacceptable LOS Failing Locations Under Existing Conditions Merge – NB SR 1 to NB I-95 (AM) 1 Freeway – I-95 NB, north of SR 1 (AM) 2 Weave – SB I-95 C-D Road (PM) 3 Weave – SB SR 1 at I-95 (PM) 4 Additional Failing Locations Under Future Conditions 8 Diverge – SB I-95 to SR 1 C-D Road (PM) 5 Merge – Road A to SR 1 NB (AM) 6 Weave – NB SR 1 between Mall & I-95 (AM) 7 Additional LOS E Locations Under Future Conditions Weave – NB I-95 at SR 1 (AM) 8 Weave – SB SR 1 between I-95 & Mall (PM) 9 Weave – SB SR 1 between Mall & Road A (PM) 10 Click for next slide

  4. N N Ramp A 5 3 2 1 Ramp B 8 4 Ramp C 7 9 10 6 I-95 / SR 1 Interchange Proposed Improvements The proposed I-95 / SR 1 interchange modifications improve or eliminate all 10 of these locations: Merge – NB SR 1 to NB I-95 (AM) 1 Improved by provision of Ramp B Freeway – I-95 NB, north of SR 1 (AM) 2 Proposed Final Configuration Improved by I-95 widening Weave – SB I-95 C-D Road (PM) 3 Weave – SB SR 1 at I-95 (PM) 4 Eliminated through provision of Ramp A Diverge – SB I-95 to SR 1 C-D Road (PM) 5 Improved by two lane takeoff to Ramp A Merge – Road A to SR 1 NB (AM) 6 Weave – NB SR 1 between Mall & I-95 (AM) 7 Improved by separation of local & through traffic Weave – NB I-95 at SR 1 (AM) 8 Eliminated through relocation of Ramp C Weave – SB SR 1 between I-95 & Mall (PM) 9 Weave – SB SR 1 between Mall & Road A (PM) 10 Improved by separation of local & through traffic

More Related