Overview plant CLEVER HOUSE. Brand NEW. Cement plant. World cement production 2010. Source: Wikipedia. Scope of delivery: Feasibility including quantity ratio development, analysis of raw materials; Creating of basic engineering;
E N D
Overview plant CLEVER HOUSE Brand NEW Cement plant
World cement production 2010 Source: Wikipedia
Scope of delivery: • Feasibility including quantity ratio development, analysis of raw materials; • Creating of basic engineering; • Creating of construction layout – as built documentation, • Delivery of the complete plant equipment; • Delivery of automation system – process control unit; • Delivery of elektrical kits – all wires and cables; • Delivery of a cement lab including station for quality monitoring; • Erection of the entire plant on civil work prepared groundings; • Taking in funktion – set and run up the completed plant; • Training of the customer‘s operating staff; • Handing over of operation manuals and trouble shooting guidlines; • One year full replacement warranty.
Scope of erection: • Erecting of the entire plant by an experienced team of the main supplier; • Erecting under supervision of an experienced German engineering team; • Erection will be done only in safe countries; • The numbers of engineers and build-up staff will be paid by the seller, • but have to be hosted by the purchaser; • In case of build-up in a unsafe country have to be veriefied separate • instalment plans between the parties; Delivery does not include: • Delivery and transportation from the customer‘s harbour to the erection place; • Civil work; • Any house-building work; • Any steel frame work, except from the supplied steel construction; • Lightning protection.
Quarry • Crushers • Raw material homogenization • Aggregates • Raw material silos • Chimney • Electrical filter • Raw material vertical mill • Raw grist silo • Evaporation cooler • Filter alkali bypass • Mixer for alkali bypass • Cyclon preheater • Coal • Coal grist mill • Filter for coal mill • Tube cooler • Filter clinker cooler • Clinker cooler • Rotary kiln • Clinker silo • Gypsum • Minerals • Classifier • Grinding mill (vertical or ball) • Packing station • Palette control station Scheme
Main supplier PI licensed by FL- Danmark
Latest project done in Aserbaidschan
Ball mill The customer determines the layout, we just recommend Vertical mill Rotary kiln
Energy facts: Gas consumption for rotary kiln: 6.673 m³/h Gas consumption for calcinator: 10.010 m³/h Electric power: 24.500 KW Process water consumtion: 931 m³/d Area facts: Entire plant layout: 200.000 m² Ground loading total: 150.000 to Transportation facts: 20“ & 40“ container boxes: 11.000 to Open sea flats: 8.000 to Heaviest parts: 150 to Gas rate: 35.82 MJ/Nm³ 28.000 KW recomm. or 95 KW/to acc. ISO
TECHNICAL REPORT FOR 4000T/D CEMENT PRODUCTION LINE 12,500t/d Final inspection together with the customer on site of supplier
Team work CLEVER HOUSE Super vision Suppliers Erection work
CLEVER HOUSE Congratulations with this plant Enjoying the new cement plant