1 / 9

Using CM to Maintain the Design Basis

Using CM to Maintain the Design Basis. Facilitated By: Lloyd Hancock Rick Harris. Examples of Design Basis Requirements Miscues. Vertical Assessment – identified unacceptable time critical action Safety injection system test lines – test procedures didn’t reflect design assumptions

elon
Download Presentation

Using CM to Maintain the Design Basis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Using CM to Maintain the Design Basis Facilitated By: Lloyd Hancock Rick Harris

  2. Examples of Design Basis Requirements Miscues • Vertical Assessment – identified unacceptable time critical action • Safety injection system test lines – test procedures didn’t reflect design assumptions • Vendor adding a platform over vessel during refueling – not evaluated properly

  3. CM Program Elements • Operations & Maintenance Procedures reviewed by Engineering • Questioning Attitude to catch obscure assumptions • Engineering review of questionable situations • Identify subtle changes to plant that modify design

  4. CM Program Elements • Change in initial conditions analysis assumptions • New employee orientation program should include CM • Capturing tribal knowledge • Transfer problem solving skills • Reward questioning attitude • Mentoring

  5. CM Program Elements • Highlighting in procedure when design requirement • Make a cross reference of links • Procedure commitment database • 50.59 review team with participation of Procedure writers • Vertical slice self assessments

  6. CM Program Elements • Assumptions in DBDs • Procedure commitment database • Oversight of non-stationpersonnel • Operating Experience • Software programs

  7. How To Assess Conformance • Vertical slice • Assessments, quick hitter • INPO AFIs – OE • Wait until NRC catches you • Operating Events • Corrective Action Program for trending

  8. How To Assess Conformance • Performance Indicators • Surveys • External Review • Bring in new people – new blood

More Related