Karoo Array Telescope (KAT v1.0) 27 K 5.1 x (15m/D)2 x (1420MHz/n)2deg2
Funding • South African Treasury has announced additional funding “towards a 10% SKA demonstrator”. • Top-down funding: ZA government desires to create a hub for Southern Hemisphere astronomy. • Total ZA investment of R1b at present. • US$140M • Includes infrastructure at about 25% of total. • This will be enough for “few percent” SKA • Additional ZA investment will require co-investment from outside • ZA government will match additional funding (or in kind contributions), up to the scale of Big KAT
KAT Meer a More KAT
MeerKAT Partnerships • Internationalisation a precondition of new funding. • Direct/in-kind/FTE/IP contributions very welcome. • Existing technology partnerships continue. • e.g. CONRAD (AU) & Berkeley (CASPER). • Links with SKADS very important. • Particularly DS2 (T1/T2) and DS4 (2-PAD). • Science and technology workshops mooted for 2007 • EU, US & ZA in addition to AU MIRANDA meetings. • Open and transparent participation process.
Includes planning for mid/low frequency aperture array Maximum baseline not yet settled – imaging vs. point sources Dish diameter not yet settled – cost function dependent on more than just science MeerKAT
Cost versus performance • Identify and determine coefficients and exponents in cost equation • Dish cost = A DiamB freqC • Receiver cost (incl. F) = C FoV • Correlator cost (X) = D Nant2 x FoV • Infrastructure cost = f(Nsta, Filling factor, Baseline, Diam… ) • Lifetime cost = ??? • 10% of total capital investment per annum is unreasonable, especially for the SKA • System engineering is producing logistics models that will be optimised to reduce lifetime costs • Performance metrics • Survey speed • Point source sensitivity • Dynamic range = 5 x = 1 x Savings = 1.5E3 x
Science goals for MeerKAT • Transients & Pulsars • Transient survey • Fast transient real-time detection system • Slow transients • Pulsar monitoring/searching • Hetrogeneous distribution • HI • 0<z<1 • Molecules • Redshifted CO • Cosmic magnetism
MeerKAT… work in progress FPA, Test range Little Blue, Cape Town PED, Cape Town SA SKA Project Office, Johannesburg KAT Team, Cape Town
MeerKAT… work in progress November 2005 May 2006 June 2006 September 2006 November 2006
MeerKAT… work in progress 28 Jan 2007 15 Nov 2006 10 Jan 2007 12 Jan 2007 20 February 2007 28 Jan 2007 6 Feb 2007 27 February 2007 19 March 2007 16 March 2007 24 March 2007 28 March 2007
MeerKAT… work in progress • www.hartrao.ac.za/xdm
Software - CONRAD • http://www.conradsoftware.org/katos
Future Future Karoo KAT Karoo Future Pre-production model (PPM) HartRAO Advanced development model (ADM) HartRAO Future HartRAO Experimental development model (XDM) Current SAAO, Cape Town Production Equivalent demonstrator (PED) Current 4x3x2 FPA Making MeerKAT happen – implementation through prototypes meerKAT Completed
Legislation: Astronomy Geographical Advantage Act • Empowers the Minister for Science and Technology to declare protected areas around strategic astronomy sites by publication in the Government Gazette. • The Act empowers the Minister to prohibit over-flights • The Act covers both radio and optical astronomy • Three tiers of protected areas: • Core area – the physical area of the observatory / instrument • Central area – surrounds the core area. Minister prohibits certain activities / categories of activities in this area • Coordination area –Minister sets standards which activities must comply with • Protected areas apply to existing and new activities
SA SKA Project Director: Bernie Fanaroff (bfanaroff@fanaroff.co.za) SA SKA Project Scientist: Justin Jonas (j.jonas@ru.ac.za) KAT Project Manager: Anita Loots (aloots@ska.ac.za) SA SKA Project Office Tel: +27 11 442 2434 www.ska.ac.za www.kat.ac.za