1 / 12

Zeus 2003: proposte dei referee

Zeus 2003: proposte dei referee. Sebastiano Albergo Giovanni Chiefari Raffaello Dalessandro CSN1 - Lecce 23 Settembre 2003. Considerazioni generali. Interazione tra macchina e rivelatore ben compresa. Attuati numerosi interventi per ridurre i fondi di Zeus:

essien
Download Presentation

Zeus 2003: proposte dei referee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Zeus 2003: proposte dei referee Sebastiano Albergo Giovanni Chiefari Raffaello Dalessandro CSN1 - Lecce 23 Settembre 2003

  2. Considerazioni generali Interazione tra macchina e rivelatore ben compresa. Attuati numerosi interventi per ridurre i fondi di Zeus: installate nuove pompe, RF shields, collimatori, assorbitori di radiazione di sincrotone. Modificato il front-end del central tracker per poter operare a tensioni più basse del nominale. risultati positivi (forse conclusivi) ma shutdown ben piu’ lungo del previsto. programma Zeus traslato nel tempo; non ancora certa la sua capacità di funzionare ad alta luminosità. Buoni i risultati sulla polarizzazione dei fasci. CSN1 - Lecce - Zeus: proposte dei referee

  3. Milestones 2003 (i) • 02/03Coordinamento di almeno 2 gruppi di fisica • ne coordinano 4 03/03 Attivare almeno 2 common task per la collaborazione • contribuiscono a 4 task 05/03 Completare il sistema di monitor della radiazione • questa milestone è al 50% 06/03 Collaborare almeno ad 8 analisi di fisica indipendenti • collaborano a circa il doppio di questo numero 09/03 Iniziare l’analisi dei dati con MVD • L’analisi è stata iniziata 11/03 Almeno 6 presentazioni a conferenze internazionali • soddisfatta 11/03 Produrre almeno 20 milioni di eventi MC in Italia • soddisfatta CSN1 - Lecce - Zeus: proposte dei referee

  4. Milestones 2003 (ii) • 12/03 Completare almeno 4 analisi di fisica • 2 sono completate 12/03 Acquisire almeno il 70% della luminosita’ raccolta da Zeus con FMUON e B/RMUON • al momento non è valutabile CSN1 - Lecce - Zeus: proposte dei referee

  5. Persone ed attivita’ Feq/Tot. Feq/Tot. 2003 2004 Bo 8.5/15 9.3/15Attivita’ 2004 Cs 2.0/4 2.1/4 - FMU + BMU+MVD Fi 3.4/4 3.4/4 - 11 mesi di presa dati To 3.3/5 3.3/5 - Analisi Pd 6.1/9 5.4/8 - coordinamenti (4) Rm 3.0/3 3.0/3 - common task (5) ------- -------- Tot. 26.3/40 26.5/39 CSN1 - Lecce - Zeus: proposte dei referee

  6. Finanziamenti (i) Criteri: MI --> 1 k€/Feq Metab. --> 1.5 k€/Feq MI (k€) Cons. (k€) C.App. (k€) Bo 9.5 14.5 Cs 2.5 3 Fi 3 4.5 To 3 3 Pd 5.5 8 + 10 65 --> Zarah +CDAQ Rm 3 4.5 ------- ------- Tot. 26.5 37.5 + 10 CSN1 - Lecce - Zeus: proposte dei referee

  7. Finanziamenti (ii) Zarah + CDAQ Usando le frazioni di sharing degli anni precedenti: Upgrade di Zarah + CDAQ 19.4% 48.5 k€ Zarah Operations 31.6% 17.4 k€ ------------ Tot. 65.9k€ CSN1 - Lecce - Zeus: proposte dei referee

  8. Finanziamenti (iii) Missioni Estere per il 2004. 1 mu=6.71KEuro - presa dati (33 mu) - responsabilità specifiche, common task e analisi (46 mu) - 12 mesi uomo per vice spokeperson = 76K€ ME (k€) Bo 150 Cs 26 Fi 35 To 35 Pd 125 + 206 sj Rm 29 ------- Tot. 400 + 206sj (Richieste  878.5 k€) CSN1 - Lecce - Zeus: proposte dei referee

  9. Milestones 2004 (i) • 02/04Coordinare di almeno 2 gruppi di fisica 03/04 Avere attivi almeno 2 common task 06/04 1 analisi di fisica con MVD iniziata • 09/04 Avere attive almeno 4 analisi su nuovi dati 11/04 Almeno 6 presentazioni a conferenze internazionali 11/04 Avere prodotto almeno 30 milioni di eventi MC CSN1 - Lecce - Zeus: proposte dei referee

  10. Milestones 2004 (ii) • 12/04 Completare almeno 4 analisi di fisica 12/04 Acquisire almeno il 70% della luminosita’ raccolta da Zeus con FMUON e B/RMUON CSN1 - Lecce - Zeus: proposte dei referee

  11. Richieste supplementari 2003 Sezione richiesta motivazione parere referee Fi 4 k€ M.E. Attività Desy Si Pd 6 k€ M.E. Differenza Carlin Si Pd 4 k€ M.E. Commissione Hera3 No CSN1 - Lecce - Zeus: proposte dei referee

  12. H1: proposte dei referee (2004) B. Stella perc. 100% + Asmone 100% MI 0.5 k€ ME 20 k€ Cons. 2 k€ Su Dota1/Rm3 CSN1 - Lecce - Zeus: proposte dei referee

More Related