1 / 33

REAL TIME DECISION SUPPORT SYSTEM BHAKRA BEAS MANAGEMENT BOARD

REAL TIME DECISION SUPPORT SYSTEM BHAKRA BEAS MANAGEMENT BOARD. BBMB – Satluj & Beas Basins. Introduction. BBMB Catchments and Sub-catchments. Introduction. RTDSS - Introduction. BBMB – Responsible for management and operation of Bhakra , Pong, Nangal and Pandoh Dams

faxon
Download Presentation

REAL TIME DECISION SUPPORT SYSTEM BHAKRA BEAS MANAGEMENT BOARD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REAL TIME DECISION SUPPORT SYSTEM BHAKRA BEAS MANAGEMENT BOARD

  2. BBMB – Satluj & Beas Basins Introduction

  3. BBMB Catchments and Sub-catchments Introduction

  4. RTDSS - Introduction • BBMB – Responsible for management and operation of • Bhakra, Pong, Nangal and Pandoh Dams • Distribution of water from • Ravi, Satluj and Beas Rivers • The need for RTDSS • For accurate inflow forecast at reservoirs • Scenario generation for various forecasts • Flood control and early warning systems • Equitable distribution of water among partner states Introduction

  5. Real Time Decision Support System • Project Objectives • The objective of BBMB Real time decision support system (RTDSS) is to incorporate state- of- the- art data acquisition system (DAS) and advanced communication system , for real time operational management of the BHAKRA and BEAS reservoirs in an integrated manner • Components of RTDSS • Data Acquisition system • Data Storage and management • Modeling Tools • Results Visualization and dissemination Introduction

  6. Financial Summary Financial Status

  7. Telemetry data • Telemetry Data – Imported from DAS server every hour • Quality checked and filtered • Updated into Database Server • Data received for • Rainfall and precipitation stations (16) • Automatic water level recorders (42) • Full Climatic Stations Temperature, humidity, sunshine, wind etc. (12) • Snow Water Equivalent – Snow Pillow (9) • Snow Depth Sensors (9) Data Acquisition System

  8. New Stations installed (10)

  9. Data Acquisition System • PROPOSED STATIONS 85 • SATLUJ 58 • BEAS 27 • GAUGING 24 • HYDRO-MET. 34 • GAUGING 18 • HYDRO-MET. • 9 Data Acquisition System • BUBBLER AND CABLEWAY 5 • S.W.E. 9 • A.R.G. 14 • RADAR 12 • BUBBLER AND CABLEWAY 5 • S.W.E 0 • A.R.G. 3 • FULL CLIMATE 6 • SNOW DEPTH ON IMD 5 • BBMB UPGRAD. 1 • FULL CLIMATE 5 • SNOW DEPTH ON IMD 1 Total stations 95 civil work completed 83 Balance 12 stations under progress

  10. Telemetry Data – Full Climatic Station Data Acquisition System Full Climatic Station Installed at Kalpa, Elevation 9046 ft

  11. Telemetry Data – Full Climatic Station Data Acquisition System Full Climatic Station Installed at Pandoh Dam, Elevation 2949 ft

  12. Telemetry Data – Snow Water Equivalent Snow Pillow Installed at Chumar, Elevation 14668 ft Data Acquisition System

  13. Telemetry Data – Snow Water Equivalent Data Acquisition System Snow Pillow Installed at Tso-Morari, Elevation 14845 ft

  14. Telemetry data – Water level recorders Data Acquisition System Automatic Water Level Recorder Installed at Olinda, Elevation : 1200 mftAMSL

  15. ADCP in Operation - Rampur Data Acquisition System

  16. Satellite Data Communication Raw Data Module Data Transmission through satellite Data Transmission from Remote Stations Data Acquisition System Modeling Server (300GB) Data Decoding Module Database Server (1 TB) DAS Server (1 TB) Backup Server (1 TB) DMS/ Backup Server (1 TB) Workstation Workstation Workstation

  17. BBMB – Control Room Data Acquisition System

  18. Real Time Data - Snapshot Data Acquisition System

  19. Data Acquisition – IMD data Rainfall and Temperature Data downloaded for 30 IMD Stations Installed Stations – 28 Balance - 30 Data Acquisition System

  20. Data Acquisition – RIMES Forecast Data Acquisition System RIMES Forecast received for 3 days, at 6 hour interval

  21. Data Acquisition – MODIS Imageries Data Acquisition System MODIS Imageries for Snow Cover downloaded twice daily

  22. Data Acquisition – TRMM Satellite Precipitation Data Acquisition System Near Real time Precipitation data downloaded at 3 hours interval

  23. Data Flow • Telemetry data received from DAS system every hour • Scheduled scripts • Run every hour to read data • Filter and populate into database software • Scheduled Download using Scripts • IMD rainfall and Temperatures, TRMM and MODIS imageries • Automatic Email Attachment download scheduled • Reads RIMES forecast from email • Reads manual data received by email • All the data populated into database in structured time series hierarchy Database

  24. Modeling - Process Models

  25. HD Modeling - Results Simulation for 5 days before Time of Forecast (ToF) and 3 days after ToF Actual Rainfall data till time of forecast RIMES forecasted rainfall for 3 days Models Forecast Period Simulation Period

  26. Flood Modeling Models

  27. Outreach Activities • SMS and Email Alerts • Website based on Dashboard • Real Time manager Interface • Trainings and Workshops • Skill Enhancements Dissemination

  28. Dashboard - Discharge Dissemination Snapshot of Website with Discharge Data

  29. Dashboard - Rainfall Dissemination Snapshot of Website with Rainfall Data

  30. Dashboard - Temperature Dissemination Snapshot of Website with Temperature Data

  31. Results Visualization - RTDSS Dissemination

  32. POST PROJECT PLAN • O & M RTDSS FOR TWO YEARS UNDER PROCESS • TWO YEARS WARRANTY AND O&M FOR DAS • THREE YEARS WARRANTY AND O&M HARDWARE Lessons Learned

  33. THANK YOU