140 likes | 433 Views
PLTU 2 X 3 MW NANGA PINOH. SITE SELECTION with PLN WILAYAH KALBAR, PLN-E, PLN RANTING NANGA PINOH KALBAR 17-21 March 2007. Alternative Lokasi PLTU cont’d. Summary of site selection. Berdasarkan analisa visual dan pembobotan maka lokasi PLTU Singkawang Baru adalah:
E N D
PLTU 2 X 3 MWNANGA PINOH SITE SELECTIONwith PLN WILAYAH KALBAR, PLN-E, PLN RANTING NANGA PINOH KALBAR 17-21 March 2007
Summary of site selection Berdasarkan analisa visual dan pembobotan maka lokasi PLTU Singkawang Baru adalah: Alternative-2 (Pantai Kura-Kura)
Alternative Lokasi PLTU Pelabuhan Kuala Pantai Pasir Panjang-2 On Going Transmission Line 150 kV Pantai Kura-Kura Pantai Gosong
GambaranPetaLokasi Pantai Kura-Kura On Going Transmission Line 150 KV
PRAKIRAAN TOTAL KEBUTUHAN AIR PLTU • AIR PENDINGIN = 1.200 m3/hari • AIR DEMIN & SERVICE = 20m3/hari • PRAKIRAAN TOTAL KEBUTUHAN BATUBARA SELAMA 1 HARI = 120 Ton SELAMA 1 BULAN = 3600 Ton PRAKIRAAN KEBUTUHAN LAHAN UNTUK COAL YARD AKTIVE STORAGE SELAMA 10 HARI = 0,07 Ha DEAD STORAGE SELAMA 1 BULAN = 0,02 Ha • PRAKIRAAN ABU YANG DIHASILKAN SELAMA 1 TAHUN = 2.500,00 Ton LUAS LAHAN YANG DISEDIAKAN = 0,04 Ha
Secondary Data Gelombang Ekstrim Tanjung Gondol
Elevasi Penting Pasang Surut Tanjung Gondol Hasil Penaksiran Selama 20 Tahun