1 / 12

Spring Lake, Michigan

Spring Lake, Michigan. Fume Hoods. CA Style Fume Hood. ADA Style Fume Hood. WI Style Fume Hood. Testing Requirements: UL 1805 ASHRAE 110 Functional test on all fume hoods. Check for proper fit. 5 F Quality Inspection Finish Fit Function Required features Check off loose parts.

flo
Download Presentation

Spring Lake, Michigan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spring Lake, Michigan

  2. Fume Hoods CA Style Fume Hood ADA Style Fume Hood WI Style Fume Hood

  3. Testing Requirements: • UL 1805 • ASHRAE 110 • Functional test on all fume hoods

  4. Check for proper fit 5 F Quality Inspection • Finish • Fit • Function • Required features • Check off loose parts Traveler of material data can also be provided if required TQM Continuous improvement internally and externally from customer input. Operate sash and all other movable controls for smooth operation

  5. Basic Design Structure: • Inner frame supports hoods interior liner and outer steel body. • Post fronts and side panels are keyed together for reduced hardware and assembly time. • Frame consists of 5 parts total. • Frame ends are a formed universal one piece unit. • Most hoods use a vertical sliding counterbalance weight for the sash.

  6. Materials: • Steel – Carbon steel with a receives chemical resistant powder coated finish or stainless steel • Preparation – Carbon steel go through a phosphate wash and receive a bonderizer prior receiving the powder coating. • Stainless steel preparation includes grinding, buffing, and polishing of parts. • For finishes see color charts and for stainless steel we supply a number 4 finish

  7. Standard models: • ADA Fume hoods • CA Control Air Fume Hoods “Airfoil Type Hood” • WI Walk-in Fume Hoods • P Perchloric Fume Hood • RI Radio Isotopes Fume Hood • FF Flat Fume Hood • SSH Single Sided Fume Hood • Demonstrator Demonstration Type Fume Hood • LFH Low Flow Fume Hood • MFH Modular Fume Hood

  8. We can provide a Customized Design

  9. Shipping And Packaging: Custom crating • Standard packaging includes corner protection and plastic wrap along with blocking wood for the sash.

  10. A Few Of Our Markets Include: • Food Laboratories • Hospital Laboratories • Chemical Laboratories • Bio-Medical Laboratories • Environmental Laboratories • Research & Development Laboratories

  11. A Commitment to Quality and Excellence, From Start . . . . . . To Finish

  12. Call us Anytime - or visit online At http://www.keurindustries.com

More Related