1 / 1

Demo & Grading

1995. Demo & Grading. Demo & Grading. Pilings. Pilings. Form & Pour Pile Caps/Grade Beams. Form & Pour Pile Caps/Grade Beams. Form & Pour 1st Flr/Columns/Walls. Form & Pour 1st Flr. Form & Pour 2nd Flr/Columns/Walls. Form & Pour 2nd Flr. Form & Pour 3rd Flr/Columns/Walls.

Download Presentation

Demo & Grading

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1995 Demo & Grading Demo & Grading Pilings Pilings Form & Pour Pile Caps/Grade Beams Form & Pour Pile Caps/Grade Beams Form & Pour 1st Flr/Columns/Walls Form & Pour 1st Flr Form & Pour 2nd Flr/Columns/Walls Form & Pour 2nd Flr Form & Pour 3rd Flr/Columns/Walls Form & Pour Roof (Dry In) Form & Pour 3rd Flr Bldg Specialties & Finishes Form & Pour Roof (Dry In) Receive & Set Equipment Planned Duration Process Piping Process Electrical Actual Duration Instrumentation Checkout & Turnover Line 1 Delay Line 2 Acceleration Line 3 Planned vs Actual Critical Path 1994 1995 1996 1997 Piling Delay Causes Acceleration 1/3/96 “Dry In” ON TIME

More Related