1 / 27

Evaluation of WRF Using High-Resolution Soil Initial

Evaluation of WRF Using High-Resolution Soil Initial Conditions from the NASA Land Information System. SPoRT Science Advisory Committee, 13 June 2007 Presented by: Jonathan L. Case. Relevance to SPoRT objectives Work done since joining SPoRT team Project overview Hypothesis

fzimmerman
Download Presentation

Evaluation of WRF Using High-Resolution Soil Initial

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluation of WRF Using High-Resolution Soil Initial Conditions from the NASA Land Information System SPoRT Science Advisory Committee, 13 June 2007 Presented by: Jonathan L. Case • Relevance to SPoRT objectives • Work done since joining SPoRT team • Project overview • Hypothesis • Background on Land Information System (LIS) • Experiment design • Results • Land Information System vs. Eta comparison • Impacts on short-term numerical forecasts • Summary / Future Work

  2. Relevance to SPoRT Program Objectives • LIS work a natural extension of MODIS SST research • Focus on 024 hour forecast problems • Use of NASA systems and tools • Land Information System developed by NASA Goddard Space Flight Center (GSFC) • Software capable of incorporating EOS datasets derived from MODIS • Fosters collaborations with external agencies • GSFC Hydrological Sciences Branch • NASA Center for Computational Sciences computing resources • LIS capable of being transitioned to operations • NCEP/AFWA operations

  3. Activities Since Previous SAC Meeting • Mr. Case joined SPoRT team in June 2006 • New SPoRT project since previous SAC meeting • Gained familiarization with the LIS software • Conducted preliminary modeling experiments using LIS with the Weather Research and Forecasting (WRF) model • Built collaborations between SPoRT and the Hydrological Sciences Branch at GSFC • Presented conference paper at annual AMS meeting (2007)

  4. Project Overview • Hypothesis: Can short-term mesoscale numerical forecasts of sensible weather elements be improved by using optimally-tuned, high-resolution soil fields? • Project Goals: Investigate and evaluate the potential benefits of using high-resolution land surface data derived from NASA systems and tools on regional short-term numerical guidance (024 hours) • Use LIS software to initialize soil temperature and moisturein the WRF model • Examine one month period with relatively benign weather • Isolate influence of land-atmosphere interactions • May 2004 over Florida peninsula

  5. The Land Information System (LIS) • Software that runs multiple Land Surface Models (LSMs) efficiently using high-performance computing • Developed by GSFC • LSMs: Noah, Community Land Model, SiB, VIC, Mosaic • Global, high-resolution datasets (down to 1 km) • User configurable features • “Spin-up” time for soil equilibrium • Input datasets • Atmospheric forcing data • LIS has been coupled to the WRF model • Can run WRF using LIS LSMs and land datasets not available in the standard WRF

  6. Experiment Design • LIS offline simulation using Noah LSM • Nested 9-km/3-km grid domain over SE U.S. • Simulation from 1 May 2002 to 1 June 2004 • Output every 12 hours during May 2004to initialize WRF runs • Atmospheric forcing datasets • North American Land Data Assimilation System (NLDAS; hourly, ~14 km) • Global Data Assimilation System (GDAS; 6-hourly, ~52 km) • GDAS used where NLDAS forcing is missing • Compare regional WRF simulations with high-resolutionLIS soil data to WRF runs with Eta model soil data • Calculate verification statistics at 80 surface stations • Plot fields to compare phenomenology differences

  7. 9-km 3-km Control WRF and LIS/WRF Configuration • Common characteristics • Nested grids: 9-km and 3-km spacing • Noah LSM • Daily 24-hour forecasts during May 2004 initialized at 0000 UTC and 1200 UTC • Atmospheric initial & boundary conditions from NCEP Eta model on 40-km grid • Differences • Control WRF: Initial soil data from Eta model • LIS/WRF experiment: Initial soil data from 2+ year LIS run on exact WRF grids

  8. Daily 0-10 cm initial soil moisture (%)(0000 UTC values during May 2004) Eta soil moisture LIS soil moisture Difference (LIS – Eta)

  9. Daily 0-10 cm initial soil moisture (%)(0000 UTC values during May 2004) Eta soil moisture LIS soil moisture • Much more detail in LIS (as expected) • LIS drier, especially over N. FL & S. GA • LIS slightly more moist over Everglades Difference (LIS – Eta) LIS Substantially Drier

  10. Daily 0-10 cm initial soil temperature (°C)(0000 UTC values during May 2004) Eta soil temperature LIS soil temperature • LIS systematically cooler over most of domain Difference (LIS – Eta)

  11. 0-10 cm initial soil moisture (%)(1200 UTC 6 May 2004) Eta soil moisture LIS soil moisture Difference (LIS – Eta)

  12. Sample Sea Breeze Evolution Differences(9-hour forecast valid 2100 UTC 6 May)

  13. Sample Sea Breeze Evolution Differences(10-hour forecast valid 2200 UTC 6 May)

  14. Sample Sea Breeze Evolution Differences(11-hour forecast valid 2300 UTC 6 May)

  15. Sample Sea Breeze Evolution Differences(12-hour forecast valid 0000 UTC 7 May)

  16. Sample Sea Breeze Evolution Differences(Meteogram plots at 40J and CTY)

  17. Verification Stats: 0000 UTC Cycle(29 forecasts @ 80 surface stations) • LIS/WRF runs reduced RMS errors by a few tenths of a degree over most forecast hours • Nocturnal warm bias and daytime cold bias both improved • Not much change in dewpoint verification stats • LIS/WRF daytime dewpoints about 0.5°C lower than control WRF • Wind Speed (not shown): LIS/WRF improved nocturnal high bias

  18. Summary / Preliminary Conclusions • Configured and tested LIS/WRF on Florida case • Initial soil fields generated on exact WRF grids • LIS generated soil fields cooler and drier than Eta model • Simulated atmosphere sensitive to changes in soil characteristics provided by LIS • Demonstrated positive improvement in sea-breeze prediction on 6 May • Improvements in diurnal prediction of 2-m temperatures during whole month (both 0000 and 1200 UTC forecast cycles)

  19. Proposed Future Activities with LIS/WRF • Merge MODIS sea-surface temperatures with LIS soil data • Study impacts of LIS soil data on convective initiation • Different regional domains & cases • Varying weather regimes (e.g. supercells vs. air-mass storms) • New case study period over Tennessee Valley • Very warm March followed by killing freeze in early April 2007 • Use real-time MODIS greenness fraction products in LIS/WRF system • Regional modeling ensembles • Summertime forecast sensitivity to soil initial condition perturbations • Run different LSMs within LIS/WRF for ensemble members • Pathway to operational regional LIS/WRF runs

  20. Alabama Freeze Case: April 2007

  21. Alabama Freeze Case: April 2007 • Proposal: • Use real greenness fraction data in LIS/WRF simulations, derived from MODIS vegetation index composite products • Measure impact on WRF forecasts compared to climo datasets

  22. Backup Slides

  23. Soil Moisture: Grid-Wide Stats; Land Points • LIS is a few % drier than Eta model in volumetric soil moisture • Variation about mean is very similar to Eta model soil moisture

  24. Soil Temp: Grid-Wide Stats; Land Points • LIS 0-10 cm soil temperatures typically cooler than Eta at 00z • LIS 0-10 cm soil temperatures about the same or slightly warmer at 12z • LIS deeper soil temperatures consistently colder than Eta

  25. Sample Sea Breeze Evolution Differences(Forecasts from 1200 UTC 6 May Simulations)

  26. Verification Stats: 1200 UTC Cycle(Surface station 40J)

  27. Verification Stats: 1200 UTC Cycle(Surface station CTY)

More Related