INPO AP-929, Rev.1

INPO AP-929, Rev.1. Presented By: Mike Stout – PPL Glenn Neises - INPO. INPO AP-929, Rev. 1. Draft developed by INPO at the request of the CMBG Steering Committee Draft dated May 2003 never issued

gail-martin
Download Presentation

INPO AP-929, Rev.1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INPO AP-929, Rev.1 Presented By: Mike Stout – PPL Glenn Neises - INPO

  2. INPO AP-929, Rev. 1 • Draft developed by INPO at the request of the CMBG Steering Committee • Draft dated May 2003 never issued • Draft really deals with modification process and some design basis; not a configuration management process • Steering Committee and INPO have agreed to work together to develop the revision that describes a configuration management process

  3. INPO AP-929, Rev. 1 • Approach  • Establish scope of the document • 80/20 rule – several members of the group will be asked to work on the document and meet for 2 days to develop the best document in that time frame • Make it consistent with ANSI/NIRMA CM 1.0-2000 • Start with new process model (IDEF0)

  4. INPO AP-929, Rev. 1 • Standard Nuclear Performance Model • (IAEA same) • Evaluate problem or request • Consider whether a design change is required • If no, then consider whether a plant change is required • If no, then consider whether a FCI change is required • Or, do nothing more and document decision

  5. INPO AP-929, Rev. 1 • Missing • Definitions are not complete • Configuration Change • Design Authority • Design Specifications • Time effect on completed and installed design • Changes • The activities in Rev. 1 are not incorrect, they are incomplete.