1 / 20

The 16 th World Meteorological Congress

REPORT BY THE PRESIDENT OF RA V Dr. Sri Woro B . Harijono CG -X V I/Doc. 2.4 Geneva, 18 May 201 1. The 16 th World Meteorological Congress. OUTLINE. ACHIEVEMENTS 2007-2011: CHALLENGES AND NEEDS 2012-2015 VISION FOR THE NEXT PERIOD. RA V Priority Areas

galvin
Download Presentation

The 16 th World Meteorological Congress

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REPORT BY THE PRESIDENT OF RA VDr. Sri Woro B. HarijonoCG-XVI/Doc. 2.4 Geneva, 18May 2011 The 16th World Meteorological Congress

  2. OUTLINE ACHIEVEMENTS 2007-2011: CHALLENGES AND NEEDS 2012-2015 VISION FOR THE NEXT PERIOD • RA V Priority Areas • RA VImportant Achievements(2007-2011) • RA VSpecific challenges and Needs (2012-2015) • The Next Financial Allocation; • Better Interaction: Technical Commission (TC) of WMO&Working Group (WG) of RA V. • WMO Working Concept & Implementation at RAs Level CG-XVI Doc. 2.4 1

  3. RA V Priority Areas • RA V Important Achievements (2007-2011) • RA V Specific Challenges and Needs (2012-2015) I. Achievements 2007-2011: Challenge and Needs 2012-2015 CG-XVI Doc. 2.4 2

  4. USA PHILIPPINES Marshall-Islands Micronesia Brunei Malaysia Palau UK KIRIBATI Singapore Papua New Guinea Tuvalu French Polynesia SOLOMONISLANDS Indonesia Vanuatu Samoa FIJI Cook Islands Potential Members Tonga • RA V Current Member: 22 Members • Latest member: Timor leste since 4 Dec ’09 • as the 189th Member of WMO NIUE • Marshall Islands • Palau • Tuvalu New Caledonia NEWZEALAND 3

  5. RA V Priorities : 2.4.24 - 27 End-to-end Multi-Hazard Early Warning Systems (MHEWS) Improvement ! Infrastructure (data and information services) for weather, climate and water Improvement ! Climate services  Better Quality ! Aviation services  Sustainability ! Capacity building 4

  6. RA V Significant Achievements Adoption of WMO SP to develop a new RA V – SOP 2012-2015 2.4.24 - 27 • Development (Refinement – Adoption – Endorsement – Approval) of RA V Strategic Operation Plan (SOP) 2012-2015 • April 2011: Refinement of draft SOP (general description – regional Key Outcomes– regional Key Performance Indicator) • May 2011: Adoptionby the President (side meeting during Cg-XVI, 2011) • Oct/ Nov 2011: Further refinement of SOP at Regional Seminar • Nov 2011: Final Approval by President 5

  7. Significant Achievements … • Establishing : • 4 Working Groups (+ Tropical Cyc. Committee) • Time bound -Task 2.4.24 - 27 Tropical Cyclone Committee Hydrological Services (theme & TL) Climate Services Weather Services Infra-structure Management Group THEMES 6 Time Bound Task

  8. CG-XVI/ DOC 2.4 Significant Achievements … 2.4.24 - 27 • 3. Assistance provided by Members and the Sec-Gento support RSMC Nadi-TCC operational activities, including (Human Resources Development) • Implementation of the pilot phase of the Severe Weather Forecasting and Disaster Risk Reduction Demonstration Project (SWFDDP), a regional subproject of SWFDP in RA V, with operational support from RSMC Wellington 8

  9. Significant Achievements ... • 5. Restructuring the responsibility area of several Tropical Cyclone WarningCenter in RA-WMO Port Moresby TCWC Jakarta TCWC Darwin TCWC South Indian Ocean Brisbane TCWC Perth TCWC 9

  10. CG-XVI/ DOC 2.4 Significant Achievements… 2.4.24 - 27 6. Implementation of the VCP coordinated project : Supported by the USA, for the provision of Low Rate User Station (LRUSs) SIDS haveaccess to Met. Satellite images in Low-Rate Information Transmission (LRIT) format 7. Assistance to several Pacific SIDS/LDCs : for the development of NMS strategic development plans and legal frameworks 10

  11. CG-XVI/ DOC 2.4 Significant Achievements… 2.4.24 - 27 • 8. Partnerships with UN and regional organizations : ASEAN, UNESCAP, SPREP, SOPAC/Secretariat of the Pacific Community (SPC) and UNDP: • The implementation of QMS in the Pacific Islands Countries (PICs) NMSs and raising the profile of meteorology and PICs NMSs among national and regional governments with SPREP • The implementation of the Pacific-HYCOS project • Establishment of Flood Early Warning Systems with SOPAC/SPC 11

  12. Cont. CG-XVI/ DOC 2.4 Significant Achievements… 2.4.24 - 27 Pacific Island Forum Leaders(PIF) August 2008 SPREP Comprehensive review Regional Met. Services in Pacific Region Pacific Island Forum Leaders (PIF) August 2010 REPORTED 12

  13. RA V Specific challenges and needs 2012-2015 : CG-XVI/ DOC 2.4 2.4.24 - 27 a) • Mobilizing and securing resources for the implementation of RA V SOP 2012-2015 • Integration of RA V SOP vs sub regional and national plans • Streamliningthem with the GFCS • HRD for NMHSs, ex: Technical maintenance experts • Establishment of RCCs to implement GFCS • Establishment of the new Reg.HydrologyCenter for RA V and the Regional Training Center for Tropical Meteorology • Training on Satellite Data Analysis, supported by Indonesia 13

  14. Specific challenges and needs… CG-XVI/ DOC 2.4 2.4.24 - 27 f) Establishment of QMS for aviation services for all RA V NMHSs g) Full operation and extension SWFDDP coverage & the-implementation of a Storm Surge Watch Scheme in the Region h) Strengthening the capabilities of RA V – NMHSs to accesssophisticated products and Capacity Building on climate modeling 14

  15. Specific challenges and needs… CG-XVI/ DOC 2.4 2.4.24 - 27 • i) Further collaboration with SPREP : • Co-organizing biennial meetings of Regional Met. Services Directors (RMSD), the newly formed Pacific Met. Council (PMC), and • Establishment of a Regional Pacific Desk for Pacific NMSs j) The development and implementation of the South-East Asian (SEA)-HYCOS project 15

  16. The Next Financial Allocation • Better Interaction : Technical Commission (TC) of WMO&Working Group (WG) of RA-V • WMO Working Concept & Implementation at RAs Level II. Vision for The Next Period CG-XVI Doc. 2.4 16

  17. VISION FOR THE NEXT FINANCIAL ALLOCATION Budgets for RA of WMO (2012 – 2015) (in Thousands of CHF) Note: New initiative, voluntary budget resources introduced by SG, to support better interaction of WMO-TC and RA-WG 17

  18. Better Interaction: Technical Commissions (TC) of WMO & Working Groups (WG) of RA V CG-XVI/ DOC 2.4 2.4.24 - 27 18

  19. WMO WORKING CONCEPT -AND- IT’S IMPLEMENTATION AT RA-V 19

  20. President of RA V WMO RA V Thank youfor your attention CG-XVI Doc. 2.4

More Related