1 / 12

WG 6 and Support Activities Overview Status Report

This report provides an overview of the status of the source code administration and support activities, including implementation updates, bug corrections, documentation updates, and progress on web page administration. It also discusses the benefits from code extensions and the need for concentrated action to update the website. Additionally, it highlights the installation of mailing lists, the use of new web features, and the publication of technical reports and newsletters.

Download Presentation

WG 6 and Support Activities Overview Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WG 6 and Support ActivitiesOverview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler

  2. The Work Packages / Tasks of SA Source Code Administration Web Page Administration Contents Manager Web Master Documentations, Newsletter, Technical Report Documentation COSMO Newsletter Technical Reports 8th General COSMO Meeting --- Bucharest, Romania

  3. Source Code Administration LM 3.17: (12.12.05) Implementation of snow density to the multilayer soil model LM 3.18: (01.03.06) CLM extensions (Restart, NetCDF, …) Changes in assimilation Implementation of FLake Model Changes to Runge-Kutta Scheme LM 3.19: (25.04.06) Minor technical changes and bug corrections LM 3.20: (29.06.06) Bug correction in output namelist groups 8th General COSMO Meeting --- Bucharest, Romania

  4. Source Code Administration (II) LM 3.21: (Work is in progress) Consolidation of CLM Consolidation of FLake Consolidation of Runge-Kutta and LMK Preparation of Ensemble Mode Technical changes (I/O) and bug corrections INT2LM: After finishing work on LM, a new version of INT2LM has to be implemented (extensions from CLM, LMK, …) 8th General COSMO Meeting --- Bucharest, Romania

  5. Benefits from CLM Extensions to the model: NetCDF, Restarts Testing long-term behaviour of the LM CLM is a self-organizing group Already found some technical inconsistencies and bugs! 8th General COSMO Meeting --- Bucharest, Romania

  6. Source Code Administration (III) Work on implementing and testing new features includes investigation of portability and optimization of the codes (is related to WP 6.1.2). Because there were only few versions, not much time was spent for testing. In the future there will be a more fine grain testing to have a better evaluation of the single changes. 8th General COSMO Meeting --- Bucharest, Romania

  7. Web Page Administration The Contents Manager: There was a commitment by Romania for the Contents Manager But this task could not be fulfilled Therefore we have a problem with the Web, which contains too much out-dated material We have to start a concentrated action in the next 2-3 months to update at least the public pages 8th General COSMO Meeting --- Bucharest, Romania

  8. Web Page Administration (II) The Web Master: Several mailing lists have been installed Exchanged mails are archived and indexed A search engine has been installed Policy of using the new features has to be discussed 8th General COSMO Meeting --- Bucharest, Romania

  9. Documentation Part II: Physical Parameterizations New: The radiation scheme Updated: Multilayer soil model Part V: Preprocessing (INT2LM) Updated: Description of Namelists Missing: The interpolation procedure / scientific issues Part VII: User´s Guide Updated: Description of Namelists Missing: A general description of the different configurations 8th General COSMO Meeting --- Bucharest, Romania

  10. Documentation (II) Missing at all: Part IV: Implementation Documentation Part VI: Postprocessing 8th General COSMO Meeting --- Bucharest, Romania

  11. Newsletter The 6th COSMO Newsletter was published late and only as Proceedings from the 7th General Meeting Since Priority Projects should aim at having a publication as deliverable (reviewed or as Technical Report), only (extended) abstracts (with references) should occur in the Newsletter The format of the Newsletter could be different again. 8th General COSMO Meeting --- Bucharest, Romania

  12. Technical Reports Only one Technical Report could be published last year: „Operational Implementation of the Multilayer Soil Model“ (by Erdmann Heise, et.al.) There will hopefully be more reports in the near future. 8th General COSMO Meeting --- Bucharest, Romania

More Related