1 / 14

Where can I find more information on specific programs related to Illinois Energy Now? 1. IEN Standard and Custom Incen

http://www.commerce.state.il.us/dceo/. http://www.ildceo.net/dceo/Bureaus/Energy_Recycling/Energy/Energy+Efficiency/#PSEE. Where can I find more information on specific programs related to Illinois Energy Now? 1. IEN Standard and Custom Incentive Programs 2. IEN New Construction Program

gellert
Download Presentation

Where can I find more information on specific programs related to Illinois Energy Now? 1. IEN Standard and Custom Incen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com http://www.commerce.state.il.us/dceo/ http://www.ildceo.net/dceo/Bureaus/Energy_Recycling/Energy/Energy+Efficiency/#PSEE Where can I find more information on specific programs related to Illinois Energy Now? 1. IEN Standard and Custom Incentive Programs 2. IEN New Construction Program 3. IEN Retro-commissioning Program 4. IEN Energy Efficiency Aggregation Program Apps due May 31 2012 5. ISBE School Energy Efficiency Grants 6. Wind & Solar Program

  2. 2012-2013 Electric Grants - $55m Gas Grants - $19m 2013-2014 Electric Grants - $55m Gas Grants - $25m Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com Projected DCEO Budgets

  3. Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com Standard Incentive Program: LightingFixture Retrofit: Existing Fixture New T-8 Lamps & Ballasts Incentive for retrofitting existing T12 lamps and magnetic ballasts with high performance T8 lamps and electronic ballasts. This measure is based on the Consortium for Energy Efficiency (CEE) high performance T8 specification (www.cee1.org). A list of qualified lamps and ballasts can be found at: http://www.cee1.org/com/com-lt/com-lt-main.php3. Indicate from the list which lamps and ballasts will be installed. You may attach the list and circle the items that will be used. Both the lamp and ballast must meet the specification in order to qualify for an incentive. Incentives for this measure are calculated per lamp installed.

  4. Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com Standard Incentive Program: Lighting Delamp/Permanent Lamp Removal during Existing Fixture Retrofit De-lamp is the net reduction in the number of lamps in a fixture. Applicants are responsible for determining whether or not to use reflectors in combination with lamp removal in order to maintain adequate lighting levels. Lighting levels are expected to meet the Illuminating Engineering Society of North America (IESNA) recommended light levels. Unused lamps, lamp holders, and ballasts must be permanently removed from the fixture and disposed of in accordance with local regulations. This measure is applicable when retrofitting from T12 lamps to T8 lamps or reconfiguring a T8 fixture to reduce the number of lamps. Removing lamps from a T12 fixture that is not being retrofitted with T8 lamps are not eligible for this incentive.

  5. Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com Standard Incentive Program: Lighting New Fluorescent Fixture with High Performance T8 or T5 Lamps Submit manufacturer specification sheet that shows new fixtures meet the new fixture specifications:. The T8 or T5 lamps must have a color rendering index (CRI) ≥ 80. The electronic ballast must be high frequency (≥20 kHz), UL listed, and warranted against defects for 5 years. Ballast power factor (PF) ≥ 0.90. Ballasts for 4-foot lamps total harmonic distortion (THD) ≤20%. Ballasts for 2- and 3-foot lamps total harmonic distortion THD ≤32%. High output T5/T8 lamps also qualify for this rebate. Projects with new T8 or T5 fixtures that operate ≥ 6,000 hours per year (such as 24-hour facilities) may apply under the Custom Incentive Program.

  6. For those electric and/or natural gas efficiency measures not listed in Standard Incentive Program Electric Custom Incentive = $0.12 per annual kWh savings Exterior LED or Induction Lighting Incentive = $0.30 per annual kWh savings Natural Gas Custom Incentive = $1.25 per annual therms savings Simple payback must be 1 to 7 years Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com Custom Incentive Program

  7. The incentives are based on how far beyond the Illinois Energy Conservation Code for Commercial Buildings that the building or the building components will be constructed. This is to encourage applicants to design the building to achieve the greatest level of energy efficiency. DCEO reserves the right to negotiate different incentive levels if the applicant is under rules that already require beyond code achievement. 2.5.2 Maximum Base Incentive Rate for New Construction Program. New Construction Incentives Electric ($.08 / kwh) Natural Gas ($.80 / therm) Buildings seeking LEED Silver, Gold or Platinum shall be eligible for Design Bonus based on percentage of beyond code energy cost savings. Maximum bonus can not exceed $50,000. Building Performance Incentive per sq. ft. 10% beyond code $0.20 15% beyond code $0.40 20% beyond code $0.60 25% beyond code $0.80 30% beyond code $1.00 Doug McMahan: Siemens Industry – 847-848-5680 / doug.mcmahan@siemens.com New Construction Program

  8. Maximum Grant Award. The Department may provide up to, but not more than, a maximum grant award of $2.50 per square foot for projects (Base plus Bonus Incentive). Funding decisions are made as funding is available and the Department is not obligated to provide the maximum grant amount. The Department reserves the right to review applications and negotiate grant amounts. Projects are subject to a cost effectiveness evaluation. 2.5.6 Maximum Incentive. The Department may provide up to, but not more than, a maximum incentive of $300,000. A single award may exceed $300,000 if the application includes multiple project locations. New Construction Cont.

  9. Audit • RX Agents (list of 22) • Agree to $10,000 spend on 18mth payback items. • Begin Implementation by May 31st, 2013 • Complete Implementation by May 31st, 2014 • Time Commitment: 60-100 hrs. • Expense can apply towards $10,000 Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com Retro-Commissioning http://smartenergy.illinois.edu/retro-commissioning.html

  10. Shut down until July 1st, 2012 Up to 50% of Cost Maximum Rebate is $30,000 Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com Wind and Solar

  11. Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com Key Web Links Public Sector Electric Efficiency (PSEE) Program Contacts • New Applications: Sally Agnew, 217.785.5081 • sally.agnew@illinois.gov • Public Schools & Community Colleges: Byron Lloyd, 217.785.3412, byron.lloyd@illinois.gov •  Public Universities, Retro-commissioning & New Construction : Tom Coe, 217.785.2433 tom.coe@illinois.gov

  12. Deduction is limited to the capitalized energy efficiency investment for the year in which the energy efficient investment is made The provision is effective for property placed in service after December 31, 2005 and prior to December 31, 2013. Deduction can be allocated to design firms for energy-efficient commercial building property expenditures made by a public entity, such as public schools, hospitals or government offices $1.80 max per square foot EPAct 2005

  13. http://www.irs.gov/irb/2008-14_IRB/ar12.html .07 Tax Consequences to Owner of Public Building. The owner of the public building is not required to include any amount in income on account of the § 179D deduction allocated to the designer. The owner of the public building is, however, required to reduce the basis of the energy efficient commercial building property (or partially qualifying commercial building property) by the amount of the § 179D deduction allocated. Doug McMahan: Siemens Industry - 847-848-5680 / doug.mcmahan@siemens.com Energy Policy Act -

  14. Contact iNFO Doug McMahan Siemens Industry, Inc Sr. Energy & Solutions Consultant Doug.mcmahan@siemens.com 847-848-5680 Mobile

More Related