200 likes | 307 Views
North & West Yorks WWT. David Stewart HM Principal Inspector, Construction Group, Leeds. Topics. Control of Asbestos Regulations 2012 RIDDOR Fee for Intervention Refurb’ Campaign – Feb/March 2012 Work plan 2012/13. Control of Asbestos Regulations 2012.
E N D
North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Topics Control of Asbestos Regulations 2012 RIDDOR Fee for Intervention Refurb’ Campaign – Feb/March 2012 Work plan 2012/13
Control of Asbestos Regulations 2012 • EU Directive on exposure to asbestos (Directive 2009/148/EC) • 6th April 2012 • What has stayed the same • What has changed • Notification • April 2015 – health surveillance • Enforcement expectation
RIDDOR • 6th April • The trigger point has increased from over three days to over seven days incapacitation (not counting the day on which the accident happened). • The deadline by which the over-seven-day injury must be reported has also increased to 15 days from the day of the day of the accident.
Fee For Intervention • Material breach –when, in the opinion of the HSE Inspector, there has been a contravention of health and safety law that requires them to notify the duty holder, in writing, of that opinion. • £124 per hour * • October 2012 ?
Refurbishment campaign Inspection initiative 20th Feb to 16th March -Refurb’ & small sites No of sites visited – 132 (3237) No of Contractors seen – 175 (4080) No of notices issued – 27 (581) FFI dry run Issues -WAH, Fire Safety, Good Order, asbestos survey
Work plan 2012/13 • Priority Areas • Asbestos • Small sites • Refurbishment • Major Projects • Timber Frame buildings • Temporary Demountable Structures