An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summing Up S. Myers, Evian 9th December 2010

  2. General Comments • Excellent workshop • Well organised • Great preparations and presentations • Animated discussion • BUT too much FOOD! • Looking forward to proceedings • ? Follow up in LMC and New Operations committee

  3. Possible Issues with 900 bunches (75ns) • Electron Cloud • Cleaning at 450GeV good for 4TeV? • Synchrotron radiation • Will scrubbing need 25ns? • UFOs (Or is it something else?) • Why is there an energy dependence (no UFOs at 450GeV) • Machine Protection (~100MJ) Not Given

  4. Strategy 2011 Decide on beam and optics parameters,E,β*,crossing angle, emittance, Nb Commission LHC with new optics parameters, loss maps, MP etc 2 weeks ? Re-establish 2010 Collisions (150ns) with new configuration Chamonix Physics up to 450 Bunches (2 weeks) (200,300,400,450) 2 weeks ? Beam Scrubbing at 450GeV for 900 bunches (75ns) using 50ns beams 1 weeks ? Attempt Physics with up to 900 Bunches (2 weeks), (200,400,600,800, 900) ? 2 weeks Decide on 150ns or 75ns for rest of 2010

  5. Beam beam studies Decision 450/900 bunches?

  6. Estimates of Peak Luminosity 1440 • I assume (optimistically) • Head on beam beam shift .01(cf.0035 design) • Separating beams in LHCb? • Emittance 1.5urad (cf 3.5 design) • Nb = 1.5e11 • β* = 1.5m

  7. Estimates of Integrated Luminosity

  8. General Comments • Excellent workshop • Well organised • Great preparations and presentations • Animated discussion • BUT too much FOOD! • Looking forward to proceedings • ? Follow up in LMC and New Operations committee