1 / 21

AIRCRAFT GLOBAL RNP APPROVALS

RNP Global Implementation , ATM Infrastructure AEA - Association of European Airlines Guenter Martis General Manager Technical & Operations. AIRCRAFT GLOBAL RNP APPROVALS. Europe: already B-RNAV, moving to P-RNAV (29 th October 2005) and thereafter (tbd) RNP-RNAV

glenda
Download Presentation

AIRCRAFT GLOBAL RNP APPROVALS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RNP Global Implementation,ATM Infrastructure AEA - Association of European AirlinesGuenter MartisGeneral Manager Technical & Operations

  2. AIRCRAFT GLOBAL RNP APPROVALS • Europe: already B-RNAV, moving to P-RNAV (29th October 2005) and thereafter (tbd) RNP-RNAV • FAA transition to performance based national airspace system, RNP based operations a major component • FAA Approval basis: AC 120-29A • JAA/EASA Approval basis: various TGLs / AMJ • Some difference in EASA and FAA methods for aircraft RNP approval which need to be sorted out! We need to create a solid global RNP regulatory requirement based on input from all parties including European ATC, EASA/JAA, ICAO etc. allowing EASA to approve RNP capability for EU operators (ref also Airbus letter to EASA/FAA, 13 May 2005)

  3. RNP Approvals: some fundamental differences! • A common understanding of associated procedure design, and the way they are protected (TERPS vs. PANS/OPS, etc.). This has a direct bearing on allowable aerodrome operating minima in different States. • Assumptions from the air navigation service provider (ANSP) e.g. navigation infrastructure, air traffic separation, safety case • Airplane capabilities for RNAV operations including RNP-RNAV and “special” approach operations and the applicable airworthiness criteria for specific applications • Operational authorization requirements.

  4. RNP Approvals in Europe • Many Authorities currently share responsibilities related to aircraft RNP approval in the EU eg. airworthiness (EASA), JOEB (EASA-JAA), OPS (JAA/NAA) and ATC (Eurocontrol/NAA) • Based on recent RNP aircraft approval projects, this sharing of responsibilities does not work! • What we need is a solid coordination of RNP aircraft approval in Europe! EASA should become responsible for ALL those safety regulatory aspects in the future including OPS and ATM safety

  5. Cooperation / harmonization on CNS/ATM • Within JAA, the JAA CNS/ATM STG has been steering the required work to develop approval material in response to European CNS programmes. FAA has been member, but did recently withdraw due to budgetary reasons. • Need continued FAA/EASA/JAA cooperation to ensure harmonization of aircraft approvals • To consider a JAA/FAA/EASA forum (CNS/ATM Harmonization Steering Group?), with active involvement of the interested parties (OEMs and airline operators) to ensure that developments do not diverge further and to steer FAA/EASA/JAA work in line with customer needs! This is also essential for the success of SESAME / EU SES

  6. VOR ETOPS ADF RVSM SATVOICE RNP 10 ACARS VDLM2 IRS MLS HF EGPWS ADS-C TCAS VHF GPS CPDLC ILS RADAR Sat Phone DME ADS-B RNP-RNAV PRNAV ATN RNP 4

  7. The international context ICAO EUROPEAN COMMISSION FAA EURO CONTROL EASA IATA AEA ERA NAA N AA JAA NAA ATA EBA Navigation Service Providers RTCA Communication Service Providers IACA IAOPA EURO CAE AIRPORTS AEEC AIRFRAME OEMs AVIONICS OEMs GROUND SYSTEMS OEMs

  8. The Principles of cost-effective Operation • Airlines’ priority: fulfil the schedule = passenger & cargo to arrive on time at the destination-gate • ATM-system needs to achieve maximum performance = enable dynamic capacity adaptations • Predictability and reliability are essential performance parameters to make the system sustainable • Collaborative decision-making of all relevant stakeholders for any phase of flight preparation or operation based on uniform situational awareness • Any failure to deliver, i.e. non-performance, results in additional cost

  9. Strategies needed to stay in the market: • Constant optimisation of the business in all areas: • Company Size and Structure • Operational Principles • Network / Partners / Alliances • Contribution to the improvement of the political / institutional frame-work (e.g. EC - SES) • Strategic guidance of the Aerospace Industry’s Research and Development • Highest consideration of the environment and social-economic realities • External factors ???

  10. The Vision • One totally harmonized European ATM-system: All elements of the system need to be standardized and fully interoperable, based on a new concept of operations(air/ground): • airspace definition • ATM- ground-infrastructure • Airplane-systems • Use of the optimum flight-path, self-separation, ground safety network, collaborative decision making(CDM) • Fair and transparent ATM-charges • European ATM must be globally harmonized

  11. Future ATM-network basics - Interoperability air side different applications different operations ONE SYSTEM Hardware blocks Software blocks different users different interfaces ground side

  12. The “Single European Sky” • EChas reacted and launched the SES-program to unify Europe’s Air Traffic Control Systems – a regulatory framework • Target is a European-wide safe and cost-effective Air Traffic Management System, based on harmonized rules for a standardized network • To create a dynamic ATM, providing Airspace-capacity according to demand and projected growth, from gate-to-gate, thus including airports • It is not a quick-win – it is an evolutionary transition which takes a lot of effort and a lot of time – a stepwise improvement.

  13. ATM -> SES -> SESAME • To make SES and the New ATM a reality, all stakeholders must identify and accept their obligations and contribute to this evolution in a holistic approach. • Tools to support this evolution are needed • AEA is leading the airspace-users in SESAME, the important European ATM-project representing the required means: • To drive the developments according to a common vision • To ensure streamlined research and development • To use the political momentum created by SES • To stay profitable in the market

  14. SESAME • SESAME is a EC/EUROCONTROL funded project • Performed by a consortium of: • Airspace-Users, • Airports • Air Navigation Service Providers • Aerospace Industry • Work to start in September 2005, approx. 1700 man-months of contribution within 2 years • Development-phase to create the ATM Master Plan, followed by the Implementation-phase to transform the master plan into reality

  15. The Necessity • COOPERATION is KEY TO SUCCESS • Airspace Users • Service providers (navigation, data, communication, …..) • Airports • Military • Aerospace industry • Research and development organisations • EUROCONTROL • European Commission • ICAO • Standardisation-Bodies The principles of the Air Transport Value Chain must be applied

  16. Manufacturer AIRPORT SERVICES ANSP The Situation Today: MARKET DRIVEN PARTLY DEREGULATED PARTLY STILL REGULATED PASSENGER AIRLINE The Air Transport Value Chain

  17. The principles Operational Needs Technical Concepts Operation Operational Concept R&D, Validation Implementation GLOBALLY HARMONIZED

  18. Some Major Topics • Operational Concept • ASAS • ADS-B • Future Communication • Data Link – CPDLC – FANS • P-RNAV, RNP, RNP-RNAV Multiple programs ongoing – in all parts of the world Harmonized Certification / Approval of Systems Worldwide cooperation needed to support the global business of Air Transport

  19. The summary • A standardised system allows seamless information exchange • Seamless information exchange allows co-operative processes • Co-operative processes allow concentration to the essence • Concentration to the essence allows simplification • Simplification reduces costs and allows workload reduction • Workload reduction allows safety increase • Safety increase allows growth

  20. A possible start – one step of many • To consider a JAA/FAA/EASA forum (CNS/ATM Harmonization Steering Group?) • active involvement of the interested parties (OEMs and airline operators) • to ensure that developments do not diverge further and to steer FAA/EASA/JAA work in line with customer needs The final goal is: A globally harmonized ATM-masterplan

  21. The New ATM - basis of our future business One Sky – GLOBAL ATM Free Flight in Friendly Skies - Safe and efficient Thank You!! www.aea.be

More Related