AIDA. Status of Electronics Module. 20 Heatsink units, locating pins and washers now on site. 1. AIDA. Status of Electronics Module. These parts complete, delivered to Liverpool Templates for the cutting of the Dow Corning form to be produced and manufactured. Fasteners to be ordered. 2.

gwidon
Download Presentation

AIDA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AIDA Status of Electronics Module 20 Heatsink units, locating pins and washers now on site. 1

  2. AIDA Status of Electronics Module These parts complete, delivered to Liverpool Templates for the cutting of the Dow Corning form to be produced and manufactured. Fasteners to be ordered. 2

  3. 3

  4. AIDA Status of Detector Mechanics PT100s and a controller have been wired by Paul and are monitoring temperature. 4

  5. AIDA Nitrogen insulated Slide is a reminder of proposed tests. Thermal tests, N2 insulating volume, with Thermocube providing cooled nitrogen for detectors. Awaiting delivery of bottled Nitrogen to lab 5

  6. AIDA This is the unit that will be used to cool the nitrogen gas. Unit on site at Daresbury. 6

  7. AIDA Status of Detector Support Cooling plates All bought out parts now at Daresbury. Other parts to be made at Liverpool Workshop, delivery expected 13th Feb Assembly at DL. Note of caution: Pauls expecting to be on paternity leave around end of Feb. Jumo Chiller Baseframe 7