An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Local Oscillator Source Unit (LSU) • Status Report • By • Karl Saad, CSA Project Manager • & • Graham Arbery, COM DEV Lead Engineer • HIFI Consortium Meeting • (19-20 April 2004, Utrecht)

  2. 2 • Overview • Technical Review – Graham Arbery • LSU technical status • LSU Requirements being discussed • LSU specification compliance • LSU Breadboard AIT Plan/Integrated Breadboard • Programmatic Status – Karl Saad • Milestone achievements • Current challenges • Outstanding issues • Project Risks • Schedule

  3. 3 LSU Technical Status • Design proceeding towards PDR on 2-3 June 2004 • All components now in house to allow assembly of integrated breadboard in May • DM fabrication has started on some parts

  4. 4

  5. 5 LSU Requirements Being Discussed • Band 6 design change under discussion: • Disable level control loop for the four Band 6 outputs • Run output amplifier in saturation to improve noise • Fixed attenuator at output to limit the power • 6 dBpp output power variation with frequency setting, temperature and life

  6. 6 LSU Requirements Being Discussed

  7. 7 LSU Specification Compliance

  8. 8 LSU Breadboard AIT Plan • Single phase lock loop (9.9-11.9 GHz) • Output chain with no ALC (31.44-35.04 GHz) • Assembled on handling plate • Planned tests at COM DEV (ambient) • Tuning ranges, lock timing • Output power variation with tuning, rail voltage • Phase noise and spurious with tuning (limited) • Planned customer tests (ambient) • Phase noise

  9. Integrated Breadboard 9

  10. HIFI LSU – Programmatic status 10 • Milestone achievements to date: • Internal PDR: held on 2 Feb 04 • Technical review with SRON, MPIfR, JPL and ESA • Enabled CSA to close off Phase B • Enabled constructive review of the LSU design • Internal to CSA – no RIDS generated. However, action items not closed off by SRON and MPIfR will be follow-up at PDR. • Project approval by Canadian Government Treasury Board on 23 Feb 04 for Phase C. • Contract with COM DEV - Phase C: detailed design and build of LSU DM as of 24 Feb 2004 • CSA QA Audit of COM DEV – completed 24 Mar 2004 • Next Project Approval - Status: • CSA Program Review and Advisory Board in April 2004 & authority to seek Treasury Board Approval • Seeking Treasury Board approval in May/June 2004 for Phase D

  11. HIFI LSU – Programmatic status 11 • Current challenges: • Impact of Tyco components on LSU delivery schedule • Breadboards (prototypes) delayed 14 weeks(Mitigation: COM DEV procurement of add'n components) • Non-flight parts (DM) delayed 12 weeks • Flight parts (FM) delayed 8 weeks • Use of silicon-alumina (AlSi) under review • Comment: -Thanks go to SRON for its assistance in helping resolve this issue. • -And also, to ESA, for responding in a very supportive way. • OmniYIG (YIG Oscillators) non-compliance with procurement specifications • These non-compliances were raised last week • Under review by COM DEV • Phase Lock Oscillator (PLO) EQM components • Suitability for use in LSU DM under review • Components not environmentally tested (shock testing)/Microwave Dynamics to perform tests • Later than desired deliveries of FM components from CPPA: • PLO from Microwave Dynamics 20 week lead time (approx 5 Sep 04) • 10 MHz Crystal Oscillator from Vectron - 8 Oct 04 • Tecnologica is addressing these issues/CSA&COM DEV following up closely

  12. HIFI LSU – Programmatic status 12 • Outstanding Issues • Band 6 Change Notice: • under impact assessment by COM DEV • CN not accepted by CSA • Potential impacts on: • LSU design and components under manufacturing • Cost impact to CSA • Schedule impact for SRON

  13. HIFI LSU – Programmatic status 13 • LSU Project Risks: • Design impacts from CPPA parts during LSU integration (non-compliant performance). • Mitigation: strong CSA & COM DEV involvement in the procurement process. LSU breadboard activities. • Parts procurement process with CPPA: ensuring timely & compliant delivery of parts to COM DEV. • Mitigation: For Tyco: SRON and CSA requested ESA's assistance in this matter. ESA appointed one focal POC for Tyco issues. For other components: CSA/COM DEV with SRON will maintain additional efforts to oversee the procurement activities (ESA could assist if required) • PFM build initiation prior to LSU DM being finalised. Calculated risk to achieve an aggressive schedule. However, there could be potential impacts in Phase D (PFM build). • Mitigation: Initiate PFM start after successful first ambient testing on DM.

  14. HIFI LSU – Schedule 14 • DM (Phase C) • PDR: 2-3 June 2004 • DM TRR: 19 Nov 2004 • Pre-ship Review: 14 Jan 2004 • LSU DM delivery to SRON: 21 Jan 2005 • SRON Target Date for DM: 1 Dec 2004 • (Delta: 7 weeks) • LSU Breadboard availability: End June 2004 • (Noise measurements)

  15. HIFI LSU – Schedule 15 • DM (Phase C) • PDR: 2-3 June 2004 • DM TRR: 19 Nov 2004 • Pre-ship Review: 14 Jan 2004 • LSU DM delivery to SRON: 21 Jan 2005 • SRON Target Date for DM: 1 Dec 2004 (Delta: 7 weeks) • LSU Breadboard availability: End June 2004 • (Noise measurements) • PFM (Phase D) • Phase D start: 3 Dec 2004 • CDR: 25 Jan 2005 • PFM TRR: 13 May 2005 • Pre-ship Review: 27 July 2005 • LSU PFM delivery to SRON: 4 Aug 2005 • SRON Target Date for PFM: 1 June 2005 (Delta: 8 weeks)