1 / 2

Program Timeline

Program Timeline. Phase II Projects Isolate priority gravel pits Chowchilla bifurcation fish protection (if needed) Modify 4B for 4,500 cfs (if needed). Phase I Projects Modify 2B for 4,500 cfs Mendota Pool Bypass Arroyo Canal/Sack Dam Sand Slough Control Structure

Download Presentation

Program Timeline

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Program Timeline • Phase II Projects • Isolate priority gravel pits • Chowchilla bifurcation fish protection (if needed) • Modify 4B for 4,500 cfs (if needed) • Phase I Projects • Modify 2B for 4,500 cfs • Mendota Pool Bypass • Arroyo Canal/Sack Dam • Sand Slough Control Structure • Modify 4B for 475 cfs • Modify Bypass Structures for Fish Passage • Salt & Mud Slough Barriers

  2. Complete Phase I Projects Complete First Phase I Environmental Reviews Final Program EIS/R – Initiate Interim Flows Draft Program EIS/R Start Phase I Project Environmental Reviews Program Timeline • Phase II Projects • Isolate priority gravel pits • Chowchilla bifurcation fish protection (if needed) • Modify 4B for 4,500 cfs (if needed) • Phase I Projects • Modify 2B for 4,500 cfs • Mendota Pool Bypass • Arroyo Canal/Sack Dam • Sand Slough Control Structure • Modify 4B for 475 cfs • Modify Bypass Structures for Fish Passage • Salt & Mud Slough Barriers

More Related