1 / 3

PHENIX Run-13 status

PHENIX Run-13 status. Hubert van Hecke for the PHENIX collaboration. Commissioning continues. Flammable gas is on since Feb 1, 2-person watch shifts started Jan 22 Cosmics taken since Feb 4, ongoing when there is no beam IR closed up since 8 th Test runs with all (~20) subsystems

hedia
Download Presentation

PHENIX Run-13 status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Hubert van Hecke - 26 Feb 13

  2. Commissioning continues • Flammable gas is on since Feb 1, 2-person watch shifts started Jan 22 • Cosmics taken since Feb 4, ongoing when there is no beam • IR closed up since 8th • Test runs with all (~20) subsystems • Full 5-person shifts as of today • - No beam: collect cosmics • Beam: subsystem checks, ‘junk runs’ to maintain system readiness • Collisions: time in subsystems (BBC, ZDC, TOF…) Hubert van Hecke - 26 Feb 13

  3. Criteria for start-of-physics • 109 bunches in the machine • Longitudinal polarization established, <5% transverse component • >=55% polarization at the start of the store • Beta* = 0.65 • >1*1011 protons/bunch Hubert van Hecke - 26 Feb 13

More Related